Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
276
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0011 # 04 Y:1984 | 04 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,107 | $2,290 | Implemented |
ST0011 # 03 Y:1984 | 03 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,083 | $190 | Implemented |
ST0011 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $93 | $45 | Implemented |
ST0011 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $869 | $435 | Implemented |
MA0012 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,078 | $100 | Implemented |
ST0011 # 01 Y:1984 | 01 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,259 | $0 | Implemented |
ST0011 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,210 | $56 | Implemented |
MA0012 # 03 Y:1984 | 03 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $422 | $550 | Implemented |
MA0012 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $40 | $25 | Implemented |
ST0011 # 09 Y:1984 | 09 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $668 | $500 | Implemented |
ST0011 # 05 Y:1984 | 05 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $138 | $0 | Implemented |
ST0011 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $148 | $537 | Not Implemented |
MA0005 # 03 Y:1984 | 03 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,993 | $200 | Implemented |
TS0011 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $481 | $800 | Not Implemented |
TS0011 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $246 | $0 | Not Implemented |
TS0011 # 05 Y:1984 | 05 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $217 | $0 | Not Implemented |
MA0005 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $22,212 | $0 | Implemented |
TS0011 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $242 | $500 | Not Implemented |
MA0005 # 04 Y:1984 | 04 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $64,789 | $140,000 | Not Implemented |
MA0005 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $314 | $0 | Implemented |
TS0011 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $677 | $2,376 | Not Implemented |
TS0011 # 03 Y:1984 | 03 | 1984 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,415 | $0 | Not Implemented |
MA0005 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $553 | $62 | Implemented |
TS0011 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,244 | $500 | Not Implemented |
KU0143 # 03 Y:1984 | 03 | 1984 | IMPROVE LUBRICATION PRACTICES | $3,966 | $0 | Not Implemented |