Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
803
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0562 # 09 Y:1998 | 09 | 1998 | METER WASTE WATER | $233 | $0 | Implemented |
OK0562 # 04 Y:1998 | 04 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $526 | $242 | Not Implemented |
OK0562 # 08 Y:1998 | 08 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,160 | $0 | Implemented |
OK0562 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $850 | $110 | Implemented |
OK0562 # 05 Y:1998 | 05 | 1998 | INSTALL OCCUPANCY SENSORS | $360 | $532 | Implemented |
GT0655 # 03 Y:1998 | 03 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,582 | $3,116 | Not Implemented |
GT0655 # 02 Y:1998 | 02 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,690 | $1,250 | Implemented |
GT0655 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,677 | $4,550 | Implemented |
GT0655 # 06 Y:1998 | 06 | 1998 | CONVERT TO ELECTROSTATIC POWDER COATING | $7,580 | $4,800 | Not Implemented |
OK0562 # 07 Y:1998 | 07 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $7,200 | $288 | Implemented |
GT0655 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $5,800 | $5,000 | Implemented |
OK0562 # 06 Y:1998 | 06 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $7,243 | $0 | Not Implemented |
OK0562 # 01 Y:1998 | 01 | 1998 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $14,801 | $1,936 | Implemented |
OK0562 # 02 Y:1998 | 02 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,344 | $1,516 | Not Implemented |
GT0655 # 07 Y:1998 | 07 | 1998 | CONVERT TO ELECTROSTATIC POWDER COATING | $4,410 | $5,400 | Not Implemented |
GT0655 # 05 Y:1998 | 05 | 1998 | MINIMIZE WATER USAGE | $6,576 | $0 | Implemented |
GT0655 # 08 Y:1998 | 08 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,500 | $0 | Not Implemented |
OK0540 # 03 Y:1998 | 03 | 1998 | OPTIMIZE PLANT POWER FACTOR | $2,129 | $0 | n/a |
OK0540 # 04 Y:1998 | 04 | 1998 | INSTALL OCCUPANCY SENSORS | $783 | $1,188 | n/a |
OK0540 # 05 Y:1998 | 05 | 1998 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,226 | $5,610 | n/a |
OK0540 # 01 Y:1998 | 01 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $5,006 | $9,000 | n/a |
OK0540 # 06 Y:1998 | 06 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $6,531 | $0 | n/a |
OK0540 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,180 | $2,828 | n/a |
AM0335 # 01 Y:1998 | 01 | 1998 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $19,840 | $320 | Not Implemented |
AM0335 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $470 | $0 | Implemented |