IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

803

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0562 # 09 Y:1998 09 1998 METER WASTE WATER $233 $0 Implemented
OK0562 # 04 Y:1998 04 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $526 $242 Not Implemented
OK0562 # 08 Y:1998 08 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,160 $0 Implemented
OK0562 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $110 Implemented
OK0562 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $360 $532 Implemented
GT0655 # 03 Y:1998 03 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,582 $3,116 Not Implemented
GT0655 # 02 Y:1998 02 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,690 $1,250 Implemented
GT0655 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,677 $4,550 Implemented
GT0655 # 06 Y:1998 06 1998 CONVERT TO ELECTROSTATIC POWDER COATING $7,580 $4,800 Not Implemented
OK0562 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $7,200 $288 Implemented
GT0655 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $5,800 $5,000 Implemented
OK0562 # 06 Y:1998 06 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,243 $0 Not Implemented
OK0562 # 01 Y:1998 01 1998 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $14,801 $1,936 Implemented
OK0562 # 02 Y:1998 02 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,344 $1,516 Not Implemented
GT0655 # 07 Y:1998 07 1998 CONVERT TO ELECTROSTATIC POWDER COATING $4,410 $5,400 Not Implemented
GT0655 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $6,576 $0 Implemented
GT0655 # 08 Y:1998 08 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,500 $0 Not Implemented
OK0540 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $2,129 $0 n/a
OK0540 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $783 $1,188 n/a
OK0540 # 05 Y:1998 05 1998 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,226 $5,610 n/a
OK0540 # 01 Y:1998 01 1998 MOVE PRODUCT USING MECHANICAL MEANS $5,006 $9,000 n/a
OK0540 # 06 Y:1998 06 1998 MOVE PRODUCT USING MECHANICAL MEANS $6,531 $0 n/a
OK0540 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,180 $2,828 n/a
AM0335 # 01 Y:1998 01 1998 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $19,840 $320 Not Implemented
AM0335 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $0 Implemented