Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,203
matching recommendationsSIC | 342 | Cutlery, Handtools, And Hardware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0372 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,223 | $16,223 | Implemented |
UF0372 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,724 | $39,583 | Not Implemented |
UF0372 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43,072 | $138,308 | Not Implemented |
UF0372 # 10 Y:2005 | 10 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $26,386 | $121,152 | Not Implemented |
UF0372 # 11 Y:2005 | 11 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,054 | $4,144 | Implemented |
UF0372 # 12 Y:2005 | 12 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,916 | $15,057 | Implemented |
UF0372 # 13 Y:2005 | 13 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,477 | $62,000 | Not Implemented |
UF0372 # 14 Y:2005 | 14 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,074,880 | $989 | Implemented |
GT0784 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,866 | $1,000 | Implemented |
GT0784 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,015 | $1,782 | Not Implemented |
GT0784 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,500 | $1,200 | Implemented |
GT0784 # 04 Y:2004 | 04 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $14,255 | $35,020 | Not Implemented |
GT0784 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $51,264 | $0 | Not Implemented |
GT0784 # 06 Y:2004 | 06 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $40,320 | $5,000 | Not Implemented |
GT0784 # 07 Y:2004 | 07 | 2004 | MINIMIZE WATER USAGE | $7,400 | $1,840 | Implemented |
GT0784 # 08 Y:2004 | 08 | 2004 | METER WASTE WATER | $4,010 | $1,100 | Implemented |
GT0784 # 09 Y:2004 | 09 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,685 | $4,550 | Not Implemented |
GT0784 # 10 Y:2004 | 10 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $14,204 | $29,000 | Not Implemented |
OR0454 # 01 Y:2004 | 01 | 2004 | REDESIGN PROCESS | $39,560 | $0 | Not Implemented |
OR0454 # 02 Y:2004 | 02 | 2004 | INSTALL SENSORS TO DETECT DEFECTS | $24,900 | $2,600 | Not Implemented |
OR0454 # 03 Y:2004 | 03 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,720 | $13,080 | Implemented |
OR0454 # 04 Y:2004 | 04 | 2004 | USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING | $16,940 | $29,200 | Implemented |
WI0458 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,180 | $17,325 | Implemented |
WI0458 # 02 Y:2004 | 02 | 2004 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $6,420 | $18,000 | Implemented |
WI0458 # 03 Y:2004 | 03 | 2004 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,400 | $3,500 | Implemented |