Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,203

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0458 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $3,959 $7,900 Implemented
WI0458 # 05 Y:2004 05 2004 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,980 $0 Not Implemented
WI0458 # 06 Y:2004 06 2004 UPGRADE CONTROLS ON COMPRESSORS $1,707 $3,500 Not Implemented
WI0458 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,053 $740 Not Implemented
UU0055 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $710 $710 Not Implemented
UU0055 # 02 Y:2003 02 2003 ADD AREA LIGHTING SWITCHES $659 $500 Not Implemented
UU0055 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $430 $1,870 Not Implemented
UU0055 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $889 $349 Not Implemented
UU0055 # 05 Y:2003 05 2003 USE HEAT PUMP FOR SPACE CONDITIONING $2,492 $39,000 Not Implemented
UU0055 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,273 $7,500 Not Implemented
UU0055 # 07 Y:2003 07 2003 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,956 $21,000 Not Implemented
SF0272 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,205 $0 Implemented
SF0272 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $542 $0 Implemented
SF0272 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,425 $190 Not Implemented
SF0272 # 04 Y:2003 04 2003 USE PHOTOCELL CONTROLS $4,362 $2,280 Not Implemented
SF0272 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $20,993 $20,000 Not Implemented
SF0272 # 06 Y:2003 06 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,079 $812 Not Implemented
SF0272 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $521 $1,231 Not Implemented
SU0165 # 01 Y:2003 01 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $99,450 $110,400 Implemented
SU0165 # 02 Y:2003 02 2003 RECOVER AND REUSE SPENT ACID BATHS $30,138 $3,234 Implemented
SU0165 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,370 $17,064 Implemented
SU0165 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,503 $937 Implemented
SU0165 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $9,177 $20,736 Not Implemented
SU0165 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,763 $5,538 Not Implemented
SU0165 # 07 Y:2003 07 2003 UPGRADE CONTROLS ON COMPRESSORS $93,620 $94,691 Implemented