Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,203
matching recommendationsSIC | 342 | Cutlery, Handtools, And Hardware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0310 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $807 | $25 | Not Implemented |
IA0310 # 05 Y:2003 | 05 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,468 | $7,349 | Implemented |
IA0310 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $204 | $0 | Implemented |
IA0310 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $523 | $0 | Implemented |
IA0310 # 08 Y:2003 | 08 | 2003 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,267 | $1,000 | Not Implemented |
IA0310 # 09 Y:2003 | 09 | 2003 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,994 | $2,000 | Not Implemented |
IA0310 # 10 Y:2003 | 10 | 2003 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $7,819 | $16,000 | Not Implemented |
WI0434 # 01 Y:2002 | 01 | 2002 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $133,384 | $140,000 | Not Implemented |
WI0434 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $9,841 | $25,000 | Not Implemented |
WI0434 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $5,168 | $11,700 | Implemented |
WI0434 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,746 | $12,600 | Not Implemented |
WI0434 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,556 | $740 | Implemented |
WI0434 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,280 | $2,832 | Not Implemented |
WI0434 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,191 | $588 | Implemented |
LM0044 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,025 | $625 | Implemented |
LM0044 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,530 | $3,825 | Not Implemented |
LM0044 # 03 Y:2002 | 03 | 2002 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $5,678 | $2,120 | Not Implemented |
LM0044 # 04 Y:2002 | 04 | 2002 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $14,885 | $0 | Implemented |
LM0044 # 05 Y:2002 | 05 | 2002 | PURCHASE APPROPRIATELY SIZED MATERIAL | $216,000 | $3,400 | Implemented |
LM0044 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $159,315 | $6,792 | Not Implemented |
LM0044 # 07 Y:2002 | 07 | 2002 | MODIFY STARTUP/SHUTDOWN TIMES | $5,695 | $300 | Not Implemented |
NC0234 # 01 Y:2002 | 01 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $47,833 | $90,000 | n/a |
NC0234 # 02 Y:2002 | 02 | 2002 | ADJUST BURNERS FOR EFFICIENT OPERATION | $744 | $800 | Implemented |
NC0234 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $1,927 | $500 | Implemented |
NC0234 # 04 Y:2002 | 04 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $199 | $289 | Implemented |