IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,203

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0310 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $807 $25 Not Implemented
IA0310 # 05 Y:2003 05 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,468 $7,349 Implemented
IA0310 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $204 $0 Implemented
IA0310 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $0 Implemented
IA0310 # 08 Y:2003 08 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $2,267 $1,000 Not Implemented
IA0310 # 09 Y:2003 09 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,994 $2,000 Not Implemented
IA0310 # 10 Y:2003 10 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,819 $16,000 Not Implemented
WI0434 # 01 Y:2002 01 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $133,384 $140,000 Not Implemented
WI0434 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $9,841 $25,000 Not Implemented
WI0434 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $5,168 $11,700 Implemented
WI0434 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,746 $12,600 Not Implemented
WI0434 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,556 $740 Implemented
WI0434 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $2,832 Not Implemented
WI0434 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,191 $588 Implemented
LM0044 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,025 $625 Implemented
LM0044 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,530 $3,825 Not Implemented
LM0044 # 03 Y:2002 03 2002 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $5,678 $2,120 Not Implemented
LM0044 # 04 Y:2002 04 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $14,885 $0 Implemented
LM0044 # 05 Y:2002 05 2002 PURCHASE APPROPRIATELY SIZED MATERIAL $216,000 $3,400 Implemented
LM0044 # 06 Y:2002 06 2002 DEVELOP STANDARD OPERATING PROCEDURES $159,315 $6,792 Not Implemented
LM0044 # 07 Y:2002 07 2002 MODIFY STARTUP/SHUTDOWN TIMES $5,695 $300 Not Implemented
NC0234 # 01 Y:2002 01 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $47,833 $90,000 n/a
NC0234 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $744 $800 Implemented
NC0234 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,927 $500 Implemented
NC0234 # 04 Y:2002 04 2002 DEVELOP A REPAIR/REPLACE POLICY $199 $289 Implemented