IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,203

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0404 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $250 $700 Not Implemented
AS0308 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $339 $548 n/a
AS0308 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,345 $120 n/a
AS0308 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,163 $4,543 n/a
AS0308 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $961 $30 n/a
AS0308 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $23,040 $60 n/a
AS0308 # 06 Y:2001 06 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $660 $106 n/a
AS0308 # 07 Y:2001 07 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $107,375 $3,303 n/a
AS0308 # 08 Y:2001 08 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $41,767 $9,675 n/a
OR0391 # 01 Y:2001 01 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $324,000 $79,300 Implemented
OR0391 # 02 Y:2001 02 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,300 $0 Implemented
OR0391 # 03 Y:2001 03 2001 COMBINE UTILITY METERS $8,935 $24,325 Not Implemented
OR0391 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $2,855 $8,000 Not Implemented
OR0391 # 05 Y:2001 05 2001 INSTALL COMMON HEADER ON COMPRESSORS $2,248 $6,400 Not Implemented
LM0004 # 01 Y:2001 01 2001 INSTALL SKYLIGHTS $8,789 $8,500 Not Implemented
LM0004 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,547 $725 Implemented
LM0004 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $910 $1,530 Not Implemented
LM0004 # 04 Y:2001 04 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,492 $1,950 Not Implemented
LM0004 # 05 Y:2001 05 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $3,420 $1,000 Not Implemented
LM0004 # 06 Y:2001 06 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $666 $1,000 Implemented
LM0004 # 07 Y:2001 07 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $44,800 $1,000 Implemented
LM0004 # 08 Y:2001 08 2001 CLEAR AND RENT EXISTING SPACE $240,000 $25,000 Not Implemented
MI0003 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,015 $10,000 Not Implemented
MI0003 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $40,000 $15,120 Not Implemented
MI0003 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,044 $312 Implemented