Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,203
matching recommendationsSIC | 342 | Cutlery, Handtools, And Hardware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0229 # 07 Y:1999 | 07 | 1999 | INSTALL BACK-UP EQUIPMENT | $23,040 | $15,000 | Not Implemented |
SD0229 # 08 Y:1999 | 08 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $76,320 | $30,000 | Not Implemented |
OD0144 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,762 | $39,160 | Not Implemented |
OD0144 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,069 | $900 | Not Implemented |
OD0144 # 03 Y:1999 | 03 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $420 | $490 | Not Implemented |
OD0144 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,332 | $20 | Not Implemented |
OD0144 # 05 Y:1999 | 05 | 1999 | UPGRADE CONTROLS ON COMPRESSORS | $4,446 | $140 | Not Implemented |
UM0136 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,707 | $9,821 | Implemented |
UM0136 # 02 Y:1999 | 02 | 1999 | AIR CONDITION ONLY SPACE NECESSARY | $1,684 | $400 | Implemented |
UM0136 # 03 Y:1999 | 03 | 1999 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,436 | $600 | Not Implemented |
UM0136 # 04 Y:1999 | 04 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,058 | $2,250 | Not Implemented |
UM0136 # 05 Y:1999 | 05 | 1999 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $48,776 | $103,584 | Not Implemented |
GT0651 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,260 | $3,100 | Not Implemented |
GT0651 # 02 Y:1998 | 02 | 1998 | COVER OPEN TANKS | $21,415 | $6,174 | Not Implemented |
GT0651 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,874 | $52,766 | Not Implemented |
GT0651 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,505 | $3,933 | Not Implemented |
GT0651 # 05 Y:1998 | 05 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,004 | $413 | Not Implemented |
GT0651 # 06 Y:1998 | 06 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $16,208 | $38,860 | Not Implemented |
GT0651 # 07 Y:1998 | 07 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,099 | $0 | Not Implemented |
GT0651 # 08 Y:1998 | 08 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $105,300 | $120,000 | Not Implemented |
KU0511 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,680 | $19,610 | Implemented |
KU0511 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,600 | $32,720 | Not Implemented |
KU0511 # 03 Y:1998 | 03 | 1998 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,080 | $3,040 | Implemented |
KU0511 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,570 | $2,550 | Implemented |
KU0511 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,560 | $800 | Implemented |