Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
426
matching recommendationsSIC | 3429 | Hardware, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0032 # 04 Y:2008 | 04 | 2008 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $757 | $300 | Implemented |
MZ0032 # 02 Y:2008 | 02 | 2008 | INSTALL OCCUPANCY SENSORS | $651 | $356 | Not Implemented |
MZ0032 # 01 Y:2008 | 01 | 2008 | INSTALL OCCUPANCY SENSORS | $1,456 | $712 | Implemented |
MZ0032 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $703 | $0 | Implemented |
IC0116 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,603 | $6,000 | Implemented |
IC0116 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $325 | $274 | Not Implemented |
IC0116 # 05 Y:2006 | 05 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,114 | $0 | Implemented |
IC0116 # 04 Y:2006 | 04 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $15,127 | $218 | Implemented |
IC0116 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $294 | $0 | Not Implemented |
IC0116 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,321 | $1,100 | Implemented |
GT0784 # 04 Y:2004 | 04 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $14,255 | $35,020 | Not Implemented |
GT0784 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,500 | $1,200 | Implemented |
GT0784 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,015 | $1,782 | Not Implemented |
GT0784 # 06 Y:2004 | 06 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $40,320 | $5,000 | Not Implemented |
GT0784 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,866 | $1,000 | Implemented |
GT0784 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $51,264 | $0 | Not Implemented |
GT0784 # 09 Y:2004 | 09 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,685 | $4,550 | Not Implemented |
GT0784 # 08 Y:2004 | 08 | 2004 | METER WASTE WATER | $4,010 | $1,100 | Implemented |
GT0784 # 07 Y:2004 | 07 | 2004 | MINIMIZE WATER USAGE | $7,400 | $1,840 | Implemented |
GT0784 # 10 Y:2004 | 10 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $14,204 | $29,000 | Not Implemented |
OR0454 # 02 Y:2004 | 02 | 2004 | INSTALL SENSORS TO DETECT DEFECTS | $24,900 | $2,600 | Not Implemented |
OR0454 # 04 Y:2004 | 04 | 2004 | USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING | $16,940 | $29,200 | Implemented |
OR0454 # 01 Y:2004 | 01 | 2004 | REDESIGN PROCESS | $39,560 | $0 | Not Implemented |
OR0454 # 03 Y:2004 | 03 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,720 | $13,080 | Implemented |
UU0055 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $710 | $710 | Not Implemented |