IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 343 Plumbing And Heating, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0643 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,970 $300 Implemented
OK0643 # 06 Y:2002 06 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $117,500 $4,800 Implemented
OK0643 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,163 $1,440 Implemented
OK0643 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $3,635 $558 Implemented
KU0403 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $161 $480 Implemented
KU0403 # 08 Y:1993 08 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $153 $551 Implemented
KU0403 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $200 Implemented
KU0403 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $375 $1,301 Implemented
KU0403 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $867 $240 Implemented
KU0351 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $662 $0 Implemented
KU0351 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,047 $1,600 Implemented
KU0351 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $693 $400 Implemented
KU0351 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,664 $744 Implemented
KU0351 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $5,020 $3,380 Implemented
KU0143 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,486 $0 Implemented
KU0143 # 13 Y:1984 13 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $183 $0 Implemented
KU0143 # 10 Y:1984 10 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $620 $920 Implemented
KU0143 # 05 Y:1984 05 1984 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,141 $2,000 Implemented
KU0143 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,586 $3,000 Implemented
KU0143 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,840 $0 Implemented