IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

271

matching recommendations
Reset
SIC 3432 Plumbing Fixture Fittings And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0233 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $331 $725 Implemented
SD0233 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,292 $360 Implemented
SD0233 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $940 $584 Implemented
SD0233 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,392 $1,394 Implemented
SD0233 # 05 Y:1999 05 1999 MAINTAIN MACHINES TO REDUCE LEAKS $6,160 $0 Implemented
SD0233 # 06 Y:1999 06 1999 AUTOMATE FINISHING PROCESS $67,000 $9,000 Not Implemented
BD0126 # 01 Y:1999 01 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $25,827 $78,000 Not Implemented
BD0126 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,009 $31,450 Implemented
BD0126 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,739 $3,302 Implemented
BD0126 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $7,645 $2,700 Not Implemented
BD0126 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,658 $1,125 Implemented
BD0126 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,785 $2,365 Implemented
BD0126 # 07 Y:1999 07 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,941 $14,000 Implemented
BD0126 # 08 Y:1999 08 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $8,527 $5,500 Implemented
BD0126 # 09 Y:1999 09 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,005 $1,500 Implemented
NC0156 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,453 $15,000 Not Implemented
NC0156 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $27,013 $1,295 Not Implemented
NC0156 # 03 Y:1999 03 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $461,046 $1,000,000 Implemented
NC0156 # 04 Y:1999 04 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $65,000 $80,000 Implemented
NC0156 # 05 Y:1999 05 1999 USE REACTIVE RINSING $2,015 $325 Not Implemented
AR0137 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,861 $190 Implemented
AR0137 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,790 $628 Implemented
AR0137 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,133 $2,052 Implemented
AR0137 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,002 $0 Implemented
AR0137 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,811 $215 Implemented