Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

271

matching recommendations
Reset
SIC 3432 Plumbing Fixture Fittings And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0137 # 06 Y:1998 06 1998 RECOVER AND REUSE COOLING WATER $4,245 $800 Implemented
AR0137 # 07 Y:1998 07 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,832 $400 Not Implemented
AR0137 # 08 Y:1998 08 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $9,565 $4,500 Implemented
AR0137 # 09 Y:1998 09 1998 MOVE PRODUCT USING MECHANICAL MEANS $65,025 $14,555 Implemented
AR0137 # 10 Y:1998 10 1998 MOVE PRODUCT USING MECHANICAL MEANS $64,949 $53,420 Not Implemented
WI0322 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $21,516 $1,000 Not Implemented
WI0322 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,052 $500 Not Implemented
WI0322 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $6,348 $1,000 Not Implemented
WI0322 # 04 Y:1998 04 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,205 $4,500 Not Implemented
WI0322 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,677 $9,000 Not Implemented
WI0322 # 06 Y:1998 06 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,817 $0 Not Implemented
WI0322 # 07 Y:1998 07 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,087 $600 Not Implemented
WI0322 # 08 Y:1998 08 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,376 $0 Not Implemented
WI0322 # 09 Y:1998 09 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $740 Not Implemented
CO0370 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,710 $500 Not Implemented
CO0370 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,770 $23,300 Not Implemented
CO0370 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $319 $623 Implemented
CO0370 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $156 $217 Implemented
CO0370 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $60 Implemented
CO0370 # 06 Y:1996 06 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $390 $1,370 Not Implemented
TN0504 # 01 Y:1993 01 1993 INSTALL TIMERS AND/OR THERMOSTATS $9,438 $3,000 Implemented
TN0504 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $8,307 $1,125 Implemented
TN0504 # 03 Y:1993 03 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $15,927 $45,191 Not Implemented
TN0504 # 04 Y:1993 04 1993 REPAIR AND ELIMINATE STEAM LEAKS $2,208 $1,350 Implemented
TN0504 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,202 $1,500 Implemented