Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 3432 | Plumbing Fixture Fittings And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0357 # 02 Y:1999 | 02 | 1999 | TREAT AND REUSE RINSE WATERS | $45,000 | $1,200 | Not Implemented |
AM0357 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,500 | $30 | Implemented |
AM0357 # 04 Y:1999 | 04 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,830 | $600 | Not Implemented |
AM0357 # 05 Y:1999 | 05 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,000 | $0 | Implemented |
AM0357 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $640 | $500 | Implemented |
AM0357 # 07 Y:1999 | 07 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $460 | $400 | Not Implemented |
AM0357 # 08 Y:1999 | 08 | 1999 | INSTALL OCCUPANCY SENSORS | $330 | $150 | Implemented |
AM0357 # 09 Y:1999 | 09 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $150 | $150 | Implemented |
AM0357 # 01 Y:1999 | 01 | 1999 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $250,000 | $285,000 | Implemented |
SD0233 # 06 Y:1999 | 06 | 1999 | AUTOMATE FINISHING PROCESS | $67,000 | $9,000 | Not Implemented |
SD0233 # 05 Y:1999 | 05 | 1999 | MAINTAIN MACHINES TO REDUCE LEAKS | $6,160 | $0 | Implemented |
SD0233 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,392 | $1,394 | Implemented |
SD0233 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $940 | $584 | Implemented |
SD0233 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,292 | $360 | Implemented |
SD0233 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $331 | $725 | Implemented |
BD0126 # 07 Y:1999 | 07 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $16,941 | $14,000 | Implemented |
BD0126 # 08 Y:1999 | 08 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $8,527 | $5,500 | Implemented |
BD0126 # 09 Y:1999 | 09 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $6,005 | $1,500 | Implemented |
BD0126 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,785 | $2,365 | Implemented |
BD0126 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,658 | $1,125 | Implemented |
BD0126 # 04 Y:1999 | 04 | 1999 | INSTALL OCCUPANCY SENSORS | $7,645 | $2,700 | Not Implemented |
BD0126 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,739 | $3,302 | Implemented |
BD0126 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $25,009 | $31,450 | Implemented |
BD0126 # 01 Y:1999 | 01 | 1999 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $25,827 | $78,000 | Not Implemented |
NC0156 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,453 | $15,000 | Not Implemented |