Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2210 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,799 $2,329 Implemented
UW2210 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $595 $0 Implemented
UW2210 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,861 $2,080 Implemented
UW2201 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,277 $3,687 Implemented
UW2201 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $9,718 $0 Implemented
UW2201 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $11,363 Implemented
BS0096 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,641 $1,104 Implemented
BS0096 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $609 $175 Implemented
BS0096 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $355 $412 Implemented
BS0096 # 06 Y:2017 06 2017 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,509 $6,000 Implemented
BS0096 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $227 $564 Implemented
OR0601 # 06 Y:2013 06 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,546 $5,306 Implemented
OR0601 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,114 $0 Implemented
OR0601 # 08 Y:2013 08 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,164 $8,104 Implemented
BS0013 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $312 $77 Implemented
BS0013 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,210 $20 Implemented
BS0013 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,038 $5,639 Implemented
BS0011 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $250 $600 Implemented
BS0011 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $4,008 $6,725 Implemented
BS0011 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,102 $973 Implemented
OR0593 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,751 $4,751 Implemented
OR0319 # 01 Y:1998 01 1998 ELIMINATE SHIFT $200,000 $2,500 Implemented
OR0319 # 02 Y:1998 02 1998 SCHEDULE DELIVERIES ACCORDING TO DEMAND $32,660 $300,000 Implemented
OR0319 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $31,569 $931 Implemented
OR0319 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $833 $1,000 Implemented