IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1062 # 03 Y:2022 03 2022 USE RADIANT HEATER FOR SPOT HEATING $12,930 $48,590 Not Implemented
OK1062 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,294 $2,732 Implemented
OK1062 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $101 $580 Implemented
OK1062 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,554 $0 Implemented
OK1062 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,957 $30,186 Implemented
OK1052 # 02 Y:2021 02 2021 USE RADIANT HEATER FOR SPOT HEATING $4,517 $19,500 Not Implemented
OK1052 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,203 $586 Not Implemented
OK1052 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $1,512 $6,000 Not Implemented
OK1052 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,648 $13,284 Implemented
OK1052 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,322 $0 Not Implemented
OK1040 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,152 $4,457 Implemented
OK1040 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,167 $70,338 Not Implemented
OK1040 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $83,427 $407,400 Not Implemented
OK1040 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,923 $2,911 Implemented
OK0971 # 09 Y:2017 09 2017 INSTALL SET-BACK TIMERS $977 $1,306 Implemented
OK0971 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,254 $39,396 Implemented
OK0971 # 03 Y:2017 03 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $199 $468 Not Implemented
OK0971 # 08 Y:2017 08 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,433 $1,608 Not Implemented
OK0971 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,570 $10,263 Implemented
OK0971 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,220 $14,212 Not Implemented
OK0971 # 07 Y:2017 07 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,676 $0 Not Implemented
OK0971 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $19,022 $4,357 Not Implemented
OK0971 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $654 $1,913 Not Implemented
OK0970 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $11,037 $9,470 Not Implemented
OK0970 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,913 $1,909 Not Implemented