Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0326 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,817 | $100 | n/a |
AS0326 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,641 | $1,600 | n/a |
AS0326 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,936 | $0 | n/a |
AS0326 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,799 | $489 | n/a |
AS0326 # 05 Y:2002 | 05 | 2002 | AUTOMATE FINISHING PROCESS | $23,920 | $582 | n/a |
AS0326 # 06 Y:2002 | 06 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $10,080 | $750 | n/a |
AS0326 # 07 Y:2002 | 07 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $12,362 | $100 | n/a |
AM0416 # 01 Y:2002 | 01 | 2002 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $64,320 | $61,000 | Implemented |
AM0416 # 02 Y:2002 | 02 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,340 | $0 | Implemented |
AM0416 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,960 | $400 | Implemented |
AM0416 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,810 | $210 | Implemented |
AM0416 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,550 | $1,000 | Implemented |
AM0416 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $860 | $410 | Implemented |
AM0416 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $565 | $250 | Implemented |
AM0416 # 08 Y:2002 | 08 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $310 | $0 | Implemented |
SD0293 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,804 | $52,000 | Implemented |
SD0293 # 02 Y:2002 | 02 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,322 | $3,700 | Implemented |
SD0293 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $5,121 | $1,000 | Implemented |
SD0293 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,238 | $280 | Implemented |
SD0293 # 05 Y:2002 | 05 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,851 | $4,092 | Not Implemented |
SD0293 # 06 Y:2002 | 06 | 2002 | INCREASE USE OF AUTOMATION | $122,000 | $45,000 | Not Implemented |
SD0293 # 07 Y:2002 | 07 | 2002 | PAY UTILITY BILLS ON TIME | $417 | $0 | Not Implemented |
MI0028 # 01 Y:2002 | 01 | 2002 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $61,673 | $3,000 | n/a |
MI0028 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,305 | $930 | n/a |
MI0028 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,032 | $255 | n/a |