IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

393

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0119 # 10 Y:1998 10 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $205 n/a
BD0119 # 11 Y:1998 11 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $132,757 $160,000 n/a
BD0119 # 12 Y:1998 12 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,430 $14,000 n/a
BD0119 # 13 Y:1998 13 1998 RECOVER AND REUSE WASTE MATERIAL $2,982 $7,000 n/a
BD0119 # 14 Y:1998 14 1998 MOVE PRODUCT USING MECHANICAL MEANS $4,359 $14,000 n/a
BD0119 # 15 Y:1998 15 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,737 $1,365 n/a
WI0324 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,936 $0 Not Implemented
WI0324 # 02 Y:1998 02 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $487 $0 Implemented
WI0324 # 03 Y:1998 03 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,780 $850 Not Implemented
WI0324 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,054 $400 Implemented
WI0324 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $381 $90 Implemented
WI0324 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $372 $640 Implemented
WI0324 # 07 Y:1998 07 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,039 $0 Not Implemented
BD0086 # 01 Y:1997 01 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,412 $2,845 Not Implemented
BD0086 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,569 $1,500 Not Implemented
BD0086 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $520 Not Implemented
BD0086 # 04 Y:1997 04 1997 INSTALL OCCUPANCY SENSORS $1,024 $750 Not Implemented
BD0086 # 05 Y:1997 05 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $904 $750 Not Implemented
BD0086 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $859 $2,750 Not Implemented
BD0086 # 07 Y:1997 07 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,554 $14,000 Not Implemented
BD0086 # 08 Y:1997 08 1997 USE A RAG RECYCLE SERVICE $1,404 $0 Not Implemented
BD0086 # 09 Y:1997 09 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $18,750 $4,000 Not Implemented
BD0081 # 02 Y:1997 02 1997 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,780 $8,410 Not Implemented
BD0081 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $977 $2,160 Implemented
BD0081 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $782 $945 Implemented