IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,493

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0173 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $805 $660 Not Implemented
BD0173 # 07 Y:2000 07 2000 RECOVER WASTE HEAT FROM EQUIPMENT $664 $750 Not Implemented
BD0173 # 08 Y:2000 08 2000 MINIMIZE WATER USAGE $2,833 $3,300 Not Implemented
BD0173 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,980 $500 Not Implemented
BD0173 # 10 Y:2000 10 2000 CLEAR AND RENT EXISTING SPACE $382,956 $150,000 Implemented
AS0290 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,680 $3,360 Implemented
AS0290 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $643 $180 Not Implemented
AS0290 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,040 $120 Implemented
AS0290 # 04 Y:2000 04 2000 INSTALL TIMERS AND/OR THERMOSTATS $815 $450 Not Implemented
AS0290 # 05 Y:2000 05 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,296 $6,000 Not Implemented
AS0290 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,134 $2,590 Implemented
AS0290 # 07 Y:2000 07 2000 USE SYNTHETIC LUBRICANT $2,736 $1,585 Implemented
AS0290 # 08 Y:2000 08 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,262 $120 Not Implemented
AS0290 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $588 $60 Not Implemented
AS0290 # 10 Y:2000 10 2000 INSTALL BACK-UP EQUIPMENT $103,995 $14,000 Not Implemented
AS0290 # 11 Y:2000 11 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $73,188 $38,400 Not Implemented
CO0474 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,930 $10,000 Implemented
CO0474 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,680 $560 Implemented
CO0474 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,060 $2,250 Not Implemented
CO0474 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70 $0 Implemented
CO0474 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $329,200 $60,000 Implemented
CO0474 # 06 Y:2000 06 2000 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $2,400 $0 Not Implemented
ND0356 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,224 $853 Implemented
ND0356 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $220 Implemented
ND0356 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $419 $400 Implemented