IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,493

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0512 # 12 Y:1999 12 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,990 $233,750 Not Implemented
WI0340 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,153 $30,618 Implemented
WI0340 # 02 Y:1999 02 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,971 $0 Not Implemented
WI0340 # 03 Y:1999 03 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,819 $6,000 Not Implemented
WI0340 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,051 $0 Implemented
WI0340 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $2,000 Implemented
WI0340 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $542 $740 Not Implemented
WI0340 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $470 $150 Implemented
WI0340 # 08 Y:1999 08 1999 COMBINE UTILITY METERS $246 $200 Not Implemented
UM0128 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,071 $1,700 Not Implemented
UM0128 # 02 Y:1999 02 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $885 $2,000 Not Implemented
UM0128 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $2,650 $1,000 Not Implemented
UM0128 # 04 Y:1999 04 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,800 $0 Not Implemented
UM0128 # 05 Y:1999 05 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $13,800 $0 Not Implemented
UM0128 # 06 Y:1999 06 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $47,700 $20,000 Not Implemented
UM0128 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $16,635 $450 Not Implemented
GT0655 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $5,800 $5,000 Implemented
GT0655 # 02 Y:1998 02 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,690 $1,250 Implemented
GT0655 # 03 Y:1998 03 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,582 $3,116 Not Implemented
GT0655 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,677 $4,550 Implemented
GT0655 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $6,576 $0 Implemented
GT0655 # 06 Y:1998 06 1998 CONVERT TO ELECTROSTATIC POWDER COATING $7,580 $4,800 Not Implemented
GT0655 # 07 Y:1998 07 1998 CONVERT TO ELECTROSTATIC POWDER COATING $4,410 $5,400 Not Implemented
GT0655 # 08 Y:1998 08 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,500 $0 Not Implemented
OK0540 # 01 Y:1998 01 1998 MOVE PRODUCT USING MECHANICAL MEANS $5,006 $9,000 n/a