Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0135 # 05 Y:1999 | 05 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,203 | $15,000 | Not Implemented |
DS0135 # 06 Y:1999 | 06 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $3,290 | $12,726 | Implemented |
DS0135 # 07 Y:1999 | 07 | 1999 | INCREASE USE OF AUTOMATION | $3,744 | $160 | Implemented |
DS0135 # 08 Y:1999 | 08 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $1,875 | $3,856 | Not Implemented |
DS0135 # 09 Y:1999 | 09 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $14,276 | $9,589 | Implemented |
KU0512 # 01 Y:1999 | 01 | 1999 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $30,880 | $31,230 | Not Implemented |
KU0512 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,150 | $28,520 | Not Implemented |
KU0512 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $10,840 | $18,000 | Not Implemented |
KU0512 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,640 | $810 | Not Implemented |
KU0512 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,460 | $270 | Not Implemented |
KU0512 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,120 | $1,800 | Not Implemented |
KU0512 # 07 Y:1999 | 07 | 1999 | INSULATE BARE EQUIPMENT | $1,520 | $1,030 | Not Implemented |
KU0512 # 08 Y:1999 | 08 | 1999 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $990 | $700 | Not Implemented |
KU0512 # 09 Y:1999 | 09 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $550 | $770 | Not Implemented |
KU0512 # 10 Y:1999 | 10 | 1999 | CONVERT TO ELECTROSTATIC POWDER COATING | $278,220 | $513,480 | Not Implemented |
KU0512 # 11 Y:1999 | 11 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $800,000 | $29,240 | Not Implemented |
KU0512 # 12 Y:1999 | 12 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $220,990 | $233,750 | Not Implemented |
WI0340 # 01 Y:1999 | 01 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,153 | $30,618 | Implemented |
WI0340 # 02 Y:1999 | 02 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,971 | $0 | Not Implemented |
WI0340 # 03 Y:1999 | 03 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $2,819 | $6,000 | Not Implemented |
WI0340 # 04 Y:1999 | 04 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,051 | $0 | Implemented |
WI0340 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,340 | $2,000 | Implemented |
WI0340 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $542 | $740 | Not Implemented |
WI0340 # 07 Y:1999 | 07 | 1999 | INSTALL OCCUPANCY SENSORS | $470 | $150 | Implemented |
WI0340 # 08 Y:1999 | 08 | 1999 | COMBINE UTILITY METERS | $246 | $200 | Not Implemented |