Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0307 # 06 Y:1998 | 06 | 1998 | DEVELOP A REPAIR/REPLACE POLICY | $46,021 | $15,765 | n/a |
ND0307 # 07 Y:1998 | 07 | 1998 | OPTIMIZE PLANT POWER FACTOR | $4,579 | $6,640 | n/a |
BD0119 # 01 Y:1998 | 01 | 1998 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $23,453 | $10,000 | n/a |
BD0119 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,670 | $4,000 | n/a |
BD0119 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,663 | $3,460 | n/a |
BD0119 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,434 | $400 | n/a |
BD0119 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,178 | $3,835 | n/a |
BD0119 # 06 Y:1998 | 06 | 1998 | INSTALL OCCUPANCY SENSORS | $1,158 | $600 | n/a |
BD0119 # 07 Y:1998 | 07 | 1998 | USE OPTIMUM THICKNESS INSULATION | $1,125 | $1,515 | n/a |
BD0119 # 08 Y:1998 | 08 | 1998 | USE OPTIMUM THICKNESS INSULATION | $549 | $2,127 | n/a |
BD0119 # 09 Y:1998 | 09 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $430 | n/a |
BD0119 # 10 Y:1998 | 10 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $230 | $205 | n/a |
BD0119 # 11 Y:1998 | 11 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $132,757 | $160,000 | n/a |
BD0119 # 12 Y:1998 | 12 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,430 | $14,000 | n/a |
BD0119 # 13 Y:1998 | 13 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $2,982 | $7,000 | n/a |
BD0119 # 14 Y:1998 | 14 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $4,359 | $14,000 | n/a |
BD0119 # 15 Y:1998 | 15 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,737 | $1,365 | n/a |
IA0209 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,970 | $3,670 | Implemented |
IA0209 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,774 | $871 | Implemented |
IA0209 # 03 Y:1998 | 03 | 1998 | INSTALL OCCUPANCY SENSORS | $530 | $399 | Not Implemented |
IA0209 # 04 Y:1998 | 04 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $255 | $50 | Not Implemented |
IA0209 # 05 Y:1998 | 05 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $68,734 | $2,250 | Not Implemented |
IA0209 # 06 Y:1998 | 06 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $6,857 | $7,990 | Implemented |
IA0209 # 07 Y:1998 | 07 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $115,785 | $151,000 | Not Implemented |
IA0209 # 08 Y:1998 | 08 | 1998 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $50,000 | $47,669 | Not Implemented |