Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0522 # 05 Y:2022 | 05 | 2022 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,028 | $7,400 | Not Implemented |
LE0522 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,085 | $4,448 | Not Implemented |
LE0522 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,680 | $12,720 | Not Implemented |
LS2217 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,079 | $50 | Not Implemented |
LS2217 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,436 | $360 | Implemented |
LS2217 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $561 | $100 | Not Implemented |
LS2217 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,897 | $1,010 | Implemented |
LS2217 # 05 Y:2022 | 05 | 2022 | USE PHOTOCELL CONTROLS | $797 | $703 | Not Implemented |
LS2217 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $198 | $338 | Implemented |
UL2202 # 01 Y:2022 | 01 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $23,158 | $0 | Implemented |
UL2202 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,861 | $12,941 | Implemented |
UL2202 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,677 | $0 | Implemented |
UL2202 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $649 | $0 | Not Implemented |
UL2202 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $16,897 | $12,250 | Not Implemented |
UL2202 # 06 Y:2022 | 06 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,126 | $1,220,427 | Not Implemented |
UL2202 # 07 Y:2022 | 07 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $495 | $4,750 | Not Implemented |
UL2202 # 08 Y:2022 | 08 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,941 | $0 | Implemented |
TT0274 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $5,185 | $9,150 | Not Implemented |
TT0274 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,579 | $18,000 | Implemented |
TT0274 # 03 Y:2022 | 03 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $2,258 | $2,000 | Not Implemented |
TT0274 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,530 | $0 | Implemented |
TT0274 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,507 | $2,040 | Not Implemented |
TT0274 # 06 Y:2022 | 06 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,438 | $1,240 | Not Implemented |
TT0274 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,129 | $1,700 | Not Implemented |
MI0402 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,050 | $1,980 | Implemented |