Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0058 # 02 Y:2004 | 02 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $21,233 | $78,000 | Not Implemented |
UU0047 # 07 Y:2003 | 07 | 2003 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $4,941 | $765 | Not Implemented |
UU0047 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $301 | $150 | Implemented |
UU0047 # 05 Y:2003 | 05 | 2003 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $3,430 | $7,126 | Not Implemented |
UU0047 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,693 | $0 | Not Implemented |
UU0047 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,044 | $9,000 | Implemented |
UU0047 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,536 | $4,800 | Not Implemented |
UU0047 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,212 | $710 | Implemented |
UU0028 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,450 | $700 | Implemented |
UU0028 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $986 | $0 | Implemented |
UU0028 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $5,590 | $9,800 | Implemented |
UU0028 # 03 Y:2002 | 03 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,500 | $7,600 | Implemented |
UU0028 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $844 | $406 | Implemented |
UU0028 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,400 | $2,000 | Implemented |
UU0028 # 07 Y:2002 | 07 | 2002 | INSTALL SKYLIGHTS | $17,689 | $2,800 | Not Implemented |
UU0028 # 08 Y:2002 | 08 | 2002 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $147,880 | $100,000 | Not Implemented |
UU0008 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,236 | $1,844 | Not Implemented |
UU0008 # 04 Y:2001 | 04 | 2001 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $5,102 | $2,600 | Implemented |
UU0008 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,204 | $460 | Implemented |
UU0008 # 02 Y:2001 | 02 | 2001 | USE SYNTHETIC LUBRICANT | $423 | $400 | Implemented |
UU0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,523 | $125 | Implemented |
UU0005 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,950 | $280 | Implemented |
UU0005 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $612 | $1,575 | Not Implemented |
UU0005 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,070 | $10,000 | Not Implemented |
UU0005 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,396 | $300 | Not Implemented |