Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
187
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0493 # 06 Y:2001 | 06 | 2001 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $7,270 | $8,240 | Not Implemented |
CO0487 # 06 Y:2001 | 06 | 2001 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $1,420 | $1,150 | Not Implemented |
CO0487 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $0 | Implemented |
CO0487 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,350 | $60 | Not Implemented |
CO0487 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,950 | $470 | Implemented |
CO0487 # 02 Y:2001 | 02 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,240 | $18,000 | Not Implemented |
CO0487 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,370 | $13,000 | Not Implemented |
CO0479 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $179,700 | $0 | Not Implemented |
CO0479 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $390 | $60 | Not Implemented |
CO0479 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $110 | Implemented |
CO0479 # 03 Y:2000 | 03 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,180 | $12,990 | Not Implemented |
CO0479 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,190 | $2,500 | Implemented |
CO0479 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,970 | $17,900 | n/a |
CO0474 # 06 Y:2000 | 06 | 2000 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $2,400 | $0 | Not Implemented |
CO0474 # 05 Y:2000 | 05 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $329,200 | $60,000 | Implemented |
CO0474 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $70 | $0 | Implemented |
CO0474 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,060 | $2,250 | Not Implemented |
CO0474 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,680 | $560 | Implemented |
CO0474 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,930 | $10,000 | Implemented |
CO0441 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $360,000 | $375,000 | Implemented |
CO0441 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,470 | $2,000 | Not Implemented |
CO0441 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,366 | $6,988 | Not Implemented |
CO0441 # 03 Y:1999 | 03 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,490 | $1,160 | Not Implemented |
CO0441 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,970 | $200 | Implemented |
CO0441 # 06 Y:1999 | 06 | 1999 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $590 | $1,090 | Not Implemented |