IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0393 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,275 $4,018 Not Implemented
LE0393 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $15,747 $40,880 Not Implemented
LE0393 # 06 Y:2015 06 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,198 $3,052 Not Implemented
LE0393 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $181 $365 Not Implemented
LE0393 # 04 Y:2015 04 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $130 $75 Not Implemented
WV0486 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,561 $100,000 Not Implemented
WV0486 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,397 $51,976 Implemented
WV0486 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,550 $688 Implemented
WV0486 # 04 Y:2014 04 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,358 $1,000 Implemented
WV0486 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $846 $3,700 Not Implemented
WV0486 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $558 $75 Implemented
WV0486 # 07 Y:2014 07 2014 DEVELOP A REPAIR/REPLACE POLICY $262 $519 Implemented
LE0370 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,947 $35 Implemented
LE0370 # 01 Y:2014 01 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,349 $0 Implemented
LE0370 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,490 $200 Implemented
LE0370 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,076 $1,000 Implemented
LE0370 # 05 Y:2014 05 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,981 $2,653 Implemented
LE0370 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,997 $4,187 Not Implemented
LE0370 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,755 $1,688 Not Implemented
LE0370 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,133 $15,100 Not Implemented
LE0370 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,070 $75,880 Not Implemented
LE0370 # 10 Y:2014 10 2014 REPLACE BOILER $61,996 $205,000 Not Implemented
LE0370 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,137 $6,750 Not Implemented
LE0352 # 07 Y:2013 07 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,176 $1,000 Not Implemented
LE0352 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,554 $4,768 Not Implemented