IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0389 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $201 $683 Not Implemented
OK0389 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $264 $147 Not Implemented
OK0381 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,587 $150 Implemented
OK0381 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $374 $1,389 Implemented
OK0381 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $11,360 $1,185 Implemented
OK0381 # 04 Y:1992 04 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,183 $26,505 Not Implemented
OK0381 # 05 Y:1992 05 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,694 $0 Not Implemented
OK0332 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,937 $900 Implemented
OK0332 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,898 $0 Not Implemented
OK0332 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $102 Implemented
OK0332 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $7,747 $1,641 Implemented
OK0332 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,085 $0 Implemented
OK0332 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,410 $1,070 Implemented
OK0284 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $738 $1,250 Implemented
OK0284 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,480 $36,560 Implemented
OK0284 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $3,808 Implemented
OK0284 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $400 $825 Implemented
OK0284 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $275 Implemented
OK0284 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $3,432 Implemented
OK0284 # 07 Y:1989 07 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,197 $31,028 Implemented
OK0284 # 08 Y:1989 08 1989 RECOVER WASTE HEAT FROM EQUIPMENT $6,816 $2,140 Implemented
OK0284 # 09 Y:1989 09 1989 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $1,525 $0 Implemented
OK0253 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,363 $1,200 Implemented
OK0253 # 02 Y:1988 02 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,357 $0 Implemented
OK0253 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $225 $57 Not Implemented