Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0430 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,292 | $1,980 | Implemented |
UD1068 # 01 Y:2023 | 01 | 2023 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $529 | $0 | Not Implemented |
UD1068 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $425 | $0 | Not Implemented |
UD1068 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,164 | $0 | Not Implemented |
UD1068 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,629 | $100 | Implemented |
UD1068 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,431 | $994 | Not Implemented |
UD1068 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $7,530 | $4,236 | Not Implemented |
MS0421 # 01 Y:2023 | 01 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,588 | $25,000 | n/a |
MS0421 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $132 | $120 | n/a |
MS0421 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $61,784 | $549,237 | n/a |
TT0300 # 10 Y:2023 | 10 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $8,509 | $17,500 | Not Implemented |
TT0300 # 11 Y:2023 | 11 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,868 | $1,965 | Implemented |
TT0300 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,047 | $221,715 | Not Implemented |
TT0300 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $41,095 | $32,000 | Implemented |
TT0300 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $22,385 | $37,500 | Not Implemented |
TT0300 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,075 | $30,000 | Not Implemented |
TT0300 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,281 | $13,000 | Not Implemented |
TT0300 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,078 | $18,500 | Not Implemented |
TT0300 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,049 | $13,500 | Not Implemented |
TT0300 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,614 | $19,910 | Implemented |
TT0300 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,809 | $156 | Implemented |
SD0642 # 01 Y:2023 | 01 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,793 | $2,300 | Not Implemented |
SD0642 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,958 | $14,573 | Not Implemented |
SD0642 # 03 Y:2023 | 03 | 2023 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $14,334 | $2,200 | Not Implemented |
SD0642 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,070 | $500 | Not Implemented |