Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0261 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $21,987 | $82,172 | Implemented |
UA0261 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,719 | $7,168 | Not Implemented |
UA0261 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $477 | $500 | Not Implemented |
UA0261 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $14,348 | $2,201 | Not Implemented |
UA0261 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $10,151 | $2,946 | Not Implemented |
UA0219 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $419 | $1,016 | Not Implemented |
UA0219 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,693 | $100 | Not Implemented |
UA0219 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $84,652 | $115,026 | Not Implemented |
UA0219 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,587 | $2,185 | Not Implemented |
UA0219 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $6,594 | $700 | Not Implemented |
UA0154 # 06 Y:2016 | 06 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $175 | $120 | Not Implemented |
UA0154 # 05 Y:2016 | 05 | 2016 | USE PHOTOCELL CONTROLS | $414 | $664 | Not Implemented |
UA0154 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $566 | $2,045 | Not Implemented |
UA0154 # 03 Y:2016 | 03 | 2016 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $201 | $508 | Not Implemented |
UA0154 # 02 Y:2016 | 02 | 2016 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,116 | $1,660 | Not Implemented |
UA0154 # 01 Y:2016 | 01 | 2016 | MODIFY STARTUP/SHUTDOWN TIMES | $3,959 | $0 | Not Implemented |
UA3022 # 04 Y:2012 | 04 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $64,995 | $90,750 | Not Implemented |
UA3022 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $31,511 | $15,063 | Not Implemented |
UA3022 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,180 | $50 | Not Implemented |
UA3022 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $54,140 | $50 | Not Implemented |
UA3016 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,180 | $1,500 | Implemented |
UA3016 # 04 Y:2011 | 04 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,387 | $2,291 | Not Implemented |
UA3016 # 05 Y:2011 | 05 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,784 | $2,000 | Not Implemented |
UA3016 # 01 Y:2011 | 01 | 2011 | BURN WOOD BY-PRODUCTS FOR HEAT | $19,294 | $53,500 | Not Implemented |
UA3016 # 02 Y:2011 | 02 | 2011 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $3,721 | $3,550 | Not Implemented |