IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0326 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,641 $1,600 n/a
AS0326 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,936 $0 n/a
AS0326 # 04 Y:2002 04 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,799 $489 n/a
AS0326 # 05 Y:2002 05 2002 AUTOMATE FINISHING PROCESS $23,920 $582 n/a
AS0326 # 06 Y:2002 06 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $10,080 $750 n/a
AS0326 # 07 Y:2002 07 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $12,362 $100 n/a
AS0326 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,817 $100 n/a
NV0148 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,562 $22,374 Implemented
NV0148 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $704 $0 Implemented
NV0148 # 03 Y:2000 03 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,341 $1,391 Not Implemented
NV0148 # 01 Y:2000 01 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $1,500 Implemented
NV0138 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $708 $1,391 Implemented
NV0138 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $932 $2,270 Not Implemented
NV0138 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,227 $6,280 Not Implemented
NV0138 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,007 $400 Implemented
NV0138 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $255 $450 Implemented
NV0134 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,801 $62,350 Not Implemented
NV0134 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $5,222 $5,533 Not Implemented
NV0134 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $855 $150 Implemented
NV0134 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,525 $344 Not Implemented
NV0134 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $18,506 $0 Not Implemented
NV0134 # 06 Y:1999 06 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $13,650 $20,000 Not Implemented
NV0068 # 08 Y:1996 08 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,350 $15,000 Implemented
NV0068 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $202 $460 Not Implemented
NV0068 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $6,568 $0 Implemented