IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0559 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $774 $660 Not Implemented
IA0559 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $673 $30 Not Implemented
IA0559 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,378 $2,300 Not Implemented
IA0559 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,791 $384 Not Implemented
IA0559 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,263 $19,592 Not Implemented
IA0558 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $281 $337 Not Implemented
IA0558 # 08 Y:2016 08 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $242 $200 Not Implemented
IA0558 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,276 $17,530 Not Implemented
IA0558 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $589 $1,290 Not Implemented
IA0558 # 06 Y:2016 06 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $352 $60 Not Implemented
IA0558 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,337 $441 Not Implemented
IA0558 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $981 $2,040 Not Implemented
IA0558 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $374 $60 Not Implemented
IA0353 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $950 $557 Implemented
IA0353 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $487 $40 Implemented
IA0353 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21 $11 Implemented
IA0353 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $155 $312 Not Implemented
IA0353 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,450 $439 Implemented
IA0353 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $603 $444 Implemented
IA0353 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $673 $1,641 Not Implemented
IA0353 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $527 $599 Not Implemented
DS0143 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,043 $640 Implemented
DS0143 # 07 Y:1999 07 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,760 $90 Implemented
DS0143 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $175 $0 Not Implemented
DS0143 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,177 $7,500 Implemented