IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0622 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,131 $800 Implemented
SD0622 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,372 $8,800 Not Implemented
SD0622 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,925 $6,341 Implemented
SD0622 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,032 $0 Not Implemented
MZ0320 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $279 $360 Implemented
MZ0320 # 06 Y:2021 06 2021 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $298 $1,226 Not Implemented
MZ0320 # 01 Y:2021 01 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $10,092 $12,000 Not Implemented
MZ0320 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,821 $240 Implemented
MZ0320 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $375 $389 Not Implemented
MZ0320 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,470 $9,762 Not Implemented
MZ0320 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,708 $15,605 Implemented
SF0577 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $141 $62 Implemented
SF0577 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,636 $26,920 Implemented
SF0577 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $4,632 $30,160 Implemented
SF0577 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,483 $0 Implemented
SF0577 # 05 Y:2021 05 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $77,365 $283,655 Implemented
DL0197 # 11 Y:2021 11 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,320 $14,125 Not Implemented
DL0197 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,313 $39,529 Implemented
DL0197 # 08 Y:2021 08 2021 REPLACE BOILER $8,560 $23,609 Not Implemented
DL0197 # 07 Y:2021 07 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,810 $1,098 Not Implemented
DL0197 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,960 $173,544 Implemented
DL0197 # 05 Y:2021 05 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,034 $1,300 Implemented
DL0197 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $730 $135 Implemented
DL0197 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,710 $0 Implemented
DL0197 # 02 Y:2021 02 2021 ADD AREA LIGHTING SWITCHES $21,520 $846 Not Implemented