IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0253 # 08 Y:1999 08 1999 PAY BILLS ON TIME TO AVOID LATE FEES $780 $60 Implemented
AS0253 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,611 $1,060 Implemented
AS0253 # 05 Y:1999 05 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $468 $560 Implemented
AS0253 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $428 $225 Implemented
AS0249 # 06 Y:1999 06 1999 ADOPT IN-HOUSE MATERIAL GENERATION $6,187 $90 Implemented
AS0249 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $213 $792 Implemented
AS0220 # 04 Y:1998 04 1998 DISCONNECT BALLASTS $355 $15 Implemented
AS0220 # 13 Y:1998 13 1998 ADD ADDITIONAL PRODUCTION SHIFT $495,547 $14,720 Implemented
AS0220 # 11 Y:1998 11 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,179 $90 Implemented
AS0220 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,801 $100 Implemented
AS0220 # 08 Y:1998 08 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,895 $12,030 Implemented
AS0220 # 03 Y:1998 03 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,126 $275 Implemented
AS0216 # 09 Y:1998 09 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $35,483 $960 Implemented
AS0216 # 08 Y:1998 08 1998 ADOPT IN-HOUSE MATERIAL GENERATION $2,435 $375 Implemented
AS0216 # 06 Y:1998 06 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,307 $940 Implemented
AS0035 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $495 $698 Implemented
AS0035 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $324 Implemented
AS0035 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $75 Implemented
AS0035 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,320 $40 Implemented
AS0035 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,203 $1,000 Implemented
AS0035 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $265 $0 Implemented