Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,107
matching recommendationsSIC | 3441 | Fabricated Structural Metal |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0063 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,981 | $3,759 | Not Implemented |
BS0063 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $143 | $357 | Implemented |
BS0063 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,150 | $1,124 | Implemented |
BS0063 # 05 Y:2015 | 05 | 2015 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,476 | $12,265 | Implemented |
BS0063 # 06 Y:2015 | 06 | 2015 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,734 | $2,453 | Not Implemented |
BS0063 # 07 Y:2015 | 07 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,883 | $503 | Implemented |
SD0515 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $209,960 | $1,040,000 | Not Implemented |
SD0515 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $163,675 | $32,788 | Not Implemented |
SD0515 # 03 Y:2015 | 03 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $49,380 | $151,600 | Not Implemented |
SD0515 # 04 Y:2015 | 04 | 2015 | UPGRADE OBSOLETE EQUIPMENT | $9,105 | $25,000 | Not Implemented |
SD0515 # 05 Y:2015 | 05 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,959 | $12,000 | Not Implemented |
SD0515 # 06 Y:2015 | 06 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,564 | $5,290 | Not Implemented |
SD0515 # 07 Y:2015 | 07 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,240 | $1,550 | Not Implemented |
SD0515 # 08 Y:2015 | 08 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $948 | $3,375 | Not Implemented |
SD0515 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $931 | $3,050 | Not Implemented |
UD0928 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,389 | $0 | Not Implemented |
UD0928 # 02 Y:2015 | 02 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $153,677 | $48,000 | Not Implemented |
UD0928 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $314,492 | $152,750 | Not Implemented |
UD0928 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $2,735 | $12,995 | Not Implemented |
UD0928 # 05 Y:2015 | 05 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $52,184 | $105,000 | Not Implemented |
UD0928 # 06 Y:2015 | 06 | 2015 | COVER OPEN TANKS | $2,876 | $2,196 | Not Implemented |
UD0928 # 07 Y:2015 | 07 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $154,780 | $150,000 | Not Implemented |
UD0928 # 08 Y:2015 | 08 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $11,986 | $18,300 | Not Implemented |
UD0928 # 09 Y:2015 | 09 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,264 | $30,000 | Not Implemented |
UD0928 # 10 Y:2015 | 10 | 2015 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,622 | $25,000 | Not Implemented |