IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,107

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0063 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,981 $3,759 Not Implemented
BS0063 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $143 $357 Implemented
BS0063 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,150 $1,124 Implemented
BS0063 # 05 Y:2015 05 2015 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,476 $12,265 Implemented
BS0063 # 06 Y:2015 06 2015 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,734 $2,453 Not Implemented
BS0063 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,883 $503 Implemented
SD0515 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $209,960 $1,040,000 Not Implemented
SD0515 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $163,675 $32,788 Not Implemented
SD0515 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,380 $151,600 Not Implemented
SD0515 # 04 Y:2015 04 2015 UPGRADE OBSOLETE EQUIPMENT $9,105 $25,000 Not Implemented
SD0515 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,959 $12,000 Not Implemented
SD0515 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,564 $5,290 Not Implemented
SD0515 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,240 $1,550 Not Implemented
SD0515 # 08 Y:2015 08 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $948 $3,375 Not Implemented
SD0515 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $931 $3,050 Not Implemented
UD0928 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,389 $0 Not Implemented
UD0928 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $153,677 $48,000 Not Implemented
UD0928 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314,492 $152,750 Not Implemented
UD0928 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,735 $12,995 Not Implemented
UD0928 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,184 $105,000 Not Implemented
UD0928 # 06 Y:2015 06 2015 COVER OPEN TANKS $2,876 $2,196 Not Implemented
UD0928 # 07 Y:2015 07 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $154,780 $150,000 Not Implemented
UD0928 # 08 Y:2015 08 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,986 $18,300 Not Implemented
UD0928 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $12,264 $30,000 Not Implemented
UD0928 # 10 Y:2015 10 2015 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,622 $25,000 Not Implemented