IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0306 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,468 $0 Implemented
SD0306 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,521 $6,822 Not Implemented
SD0306 # 03 Y:2002 03 2002 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,708 $1,000 Not Implemented
SD0306 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,006 $240 Not Implemented
SD0306 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,205 $23,000 Not Implemented
SD0121 # 04 Y:1995 04 1995 REDUCE EXCESSIVE BOILER BLOWDOWN $664 $15 Implemented
SD0121 # 01 Y:1995 01 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,420 $7,500 Implemented
SD0121 # 02 Y:1995 02 1995 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $3,648 $977 Implemented
SD0121 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $656 $702 Implemented
SD0121 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,118 $1,583 Implemented
SD0121 # 06 Y:1995 06 1995 ADD AREA LIGHTING SWITCHES $1,489 $800 Not Implemented
SD0121 # 07 Y:1995 07 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,093 $90 Not Implemented
SD0121 # 08 Y:1995 08 1995 USE PHOTOCELL CONTROLS $337 $135 Implemented
SD0121 # 09 Y:1995 09 1995 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,480 $0 Implemented
SD0121 # 10 Y:1995 10 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,433 $0 Implemented
SD0022 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,880 $1,817 Implemented
SD0022 # 10 Y:1992 10 1992 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,222 $0 Implemented
SD0022 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,496 $2,200 Implemented
SD0022 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $584 $999 Implemented
SD0022 # 07 Y:1992 07 1992 KEEP LAMPS AND REFLECTORS CLEAN $24,184 $51,124 Not Implemented
SD0022 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $138 $122 Implemented
SD0022 # 05 Y:1992 05 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $158 $138 Implemented
SD0022 # 04 Y:1992 04 1992 COVER OPEN TANKS $516 $169 Implemented
SD0022 # 03 Y:1992 03 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $591 $15 Implemented
SD0022 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,846 $2,000 Implemented