IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0768 # 15 Y:2008 15 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $131,460 $41,080 Implemented
OK0768 # 14 Y:2008 14 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,760 $7,525 Implemented
OK0768 # 13 Y:2008 13 2008 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,952 $64,800 Implemented
OK0768 # 12 Y:2008 12 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,034 $129,640 Implemented
OK0768 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,704 $17,980 Implemented
AR0159 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,728 $110 Implemented
AR0159 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $42,045 $30,000 Implemented
AR0159 # 07 Y:1999 07 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,764 $0 Implemented
AR0159 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,513 $100 Implemented
AR0159 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $749 $1,547 Implemented
AR0159 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $453 $0 Implemented
AR0159 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $196 $104 Implemented
AR0110 # 08 Y:1997 08 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,987 $0 Implemented
AR0110 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,600 $1,000 Implemented
AR0110 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,619 $687 Implemented
AR0110 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,096 $4,230 Implemented
AR0077 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,408 $1,750 Implemented
AR0077 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,539 $360 Implemented
AR0043 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,278 $1,074 Implemented
AR0043 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,100 $1,000 Implemented
AR0043 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,361 $350 Implemented
AR0043 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,070 $540 Implemented
OK0321 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $39,907 $25,000 Implemented
OK0321 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $8,220 $2,876 Implemented
OK0321 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $102 $0 Implemented