IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0448 # 01 Y:2018 01 2018 INSTALL TIMERS AND/OR THERMOSTATS $2,899 $25 Implemented
LE0448 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,450 $25 Implemented
LE0448 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,660 $5,250 Implemented
LE0448 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,721 $11,738 Implemented
LE0448 # 08 Y:2018 08 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,258 $30,000 Implemented
LE0448 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $843 $4,225 Implemented
LE0344 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $40 Implemented
LE0344 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,371 $375 Implemented
WV0413 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,291 $154,121 Implemented
WV0413 # 16 Y:2010 16 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $288 $357 Implemented
WV0413 # 04 Y:2010 04 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,435 $55,000 Implemented
WV0413 # 06 Y:2010 06 2010 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $24,889 $9,534 Implemented
WV0413 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,418 $0 Implemented
WV0413 # 09 Y:2010 09 2010 DEVELOP A REPAIR/REPLACE POLICY $10,138 $1,674 Implemented
WV0413 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,414 $0 Implemented
WV0413 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,242 $16,759 Implemented
WV0413 # 14 Y:2010 14 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,830 $6,571 Implemented
WV0413 # 15 Y:2010 15 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,069 $1,000 Implemented
WV0118 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $2,043 $2,000 Implemented
WV0118 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $19,200 $1,700 Implemented
WV0118 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,763 $10,400 Implemented
WV0118 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,026 $200 Implemented
WV0118 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $610 Implemented
WV0092 # 10 Y:1996 10 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,503 $8,000 Implemented
WV0092 # 09 Y:1996 09 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,321 $534 Implemented