Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0448 # 01 Y:2018 | 01 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $2,899 | $25 | Implemented |
LE0448 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,450 | $25 | Implemented |
LE0448 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,660 | $5,250 | Implemented |
LE0448 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,721 | $11,738 | Implemented |
LE0448 # 08 Y:2018 | 08 | 2018 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $6,258 | $30,000 | Implemented |
LE0448 # 09 Y:2018 | 09 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $843 | $4,225 | Implemented |
LE0344 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $40 | Implemented |
LE0344 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,371 | $375 | Implemented |
WV0413 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77,291 | $154,121 | Implemented |
WV0413 # 16 Y:2010 | 16 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $288 | $357 | Implemented |
WV0413 # 04 Y:2010 | 04 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $59,435 | $55,000 | Implemented |
WV0413 # 06 Y:2010 | 06 | 2010 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $24,889 | $9,534 | Implemented |
WV0413 # 07 Y:2010 | 07 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $14,418 | $0 | Implemented |
WV0413 # 09 Y:2010 | 09 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $10,138 | $1,674 | Implemented |
WV0413 # 11 Y:2010 | 11 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,414 | $0 | Implemented |
WV0413 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,242 | $16,759 | Implemented |
WV0413 # 14 Y:2010 | 14 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,830 | $6,571 | Implemented |
WV0413 # 15 Y:2010 | 15 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,069 | $1,000 | Implemented |
WV0118 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $2,043 | $2,000 | Implemented |
WV0118 # 08 Y:1997 | 08 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,200 | $1,700 | Implemented |
WV0118 # 05 Y:1997 | 05 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,763 | $10,400 | Implemented |
WV0118 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,026 | $200 | Implemented |
WV0118 # 01 Y:1997 | 01 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $535 | $610 | Implemented |
WV0092 # 10 Y:1996 | 10 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,503 | $8,000 | Implemented |
WV0092 # 09 Y:1996 | 09 | 1996 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,321 | $534 | Implemented |