Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0174 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $214,998 | $360,000 | Not Implemented |
MI0174 # 06 Y:2008 | 06 | 2008 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,075 | $322 | Implemented |
MI0174 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,087 | $13,200 | Not Implemented |
MI0174 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,041 | $1,210 | Implemented |
MI0174 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,544 | $40 | Implemented |
MI0174 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $32,694 | $2,000 | Implemented |
MI0084 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $198 | $0 | Not Implemented |
MI0084 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $697 | $590 | Not Implemented |
MI0084 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $28,289 | $17,650 | Not Implemented |
MI0084 # 02 Y:2004 | 02 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $600,000 | $183,400 | Not Implemented |
MI0084 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,732 | $1,000 | Not Implemented |
MI0082 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,282 | $2,670 | Implemented |
MI0082 # 07 Y:2004 | 07 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,594 | $40 | Not Implemented |
MI0082 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,241 | $610 | Not Implemented |
MI0082 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,313 | $13,803 | Not Implemented |
MI0082 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT TO MOVE PRODUCT | $47,434 | $41,672 | Not Implemented |
MI0082 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,385 | $2,300 | Implemented |
MI0082 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,443 | $96,600 | Not Implemented |
UF0308 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,465 | $10,121 | n/a |
UF0308 # 04 Y:2002 | 04 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,184 | $1,033 | n/a |
UF0308 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,612 | $500 | n/a |
UF0308 # 06 Y:2002 | 06 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,687 | $19,500 | n/a |
UF0308 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,366 | $0 | n/a |
UF0308 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $4,591 | $291 | n/a |
UF0308 # 07 Y:2002 | 07 | 2002 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $4,770 | $864 | n/a |