IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

859

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0082 # 03 Y:2004 03 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $47,434 $41,672 Not Implemented
MI0082 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $2,670 Implemented
MI0082 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,313 $13,803 Not Implemented
MI0082 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,241 $610 Not Implemented
MI0082 # 07 Y:2004 07 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,594 $40 Not Implemented
AM0457 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,750 $21 Implemented
AM0457 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,360 $4,370 Implemented
AM0457 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,270 $120 Implemented
AM0457 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $790 $500 Implemented
AM0457 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $265 $130 Implemented
AM0457 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $230 $0 Implemented
AM0457 # 07 Y:2004 07 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $84,400 $8,800 Not Implemented
AM0457 # 08 Y:2004 08 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,910 $880 Implemented
UF0308 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,465 $10,121 n/a
UF0308 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,612 $500 n/a
UF0308 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,366 $0 n/a
UF0308 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,184 $1,033 n/a
UF0308 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $4,591 $291 n/a
UF0308 # 06 Y:2002 06 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,687 $19,500 n/a
UF0308 # 07 Y:2002 07 2002 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $4,770 $864 n/a
AS0326 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,817 $100 n/a
AS0326 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,641 $1,600 n/a
AS0326 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,936 $0 n/a
AS0326 # 04 Y:2002 04 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,799 $489 n/a
AS0326 # 05 Y:2002 05 2002 AUTOMATE FINISHING PROCESS $23,920 $582 n/a