IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

859

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0159 # 07 Y:1999 07 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,764 $0 Implemented
AR0159 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,409 $5,000 Not Implemented
AR0159 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $42,045 $30,000 Implemented
DS0135 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $835 $2,974 Implemented
DS0135 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,395 $351 Implemented
DS0135 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $5,760 $6,500 Not Implemented
DS0135 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $11,263 $22,640 Not Implemented
DS0135 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,203 $15,000 Not Implemented
DS0135 # 06 Y:1999 06 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $3,290 $12,726 Implemented
DS0135 # 07 Y:1999 07 1999 INCREASE USE OF AUTOMATION $3,744 $160 Implemented
DS0135 # 08 Y:1999 08 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $1,875 $3,856 Not Implemented
DS0135 # 09 Y:1999 09 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $14,276 $9,589 Implemented
KU0512 # 01 Y:1999 01 1999 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $30,880 $31,230 Not Implemented
KU0512 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,150 $28,520 Not Implemented
KU0512 # 03 Y:1999 03 1999 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,840 $18,000 Not Implemented
KU0512 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,640 $810 Not Implemented
KU0512 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,460 $270 Not Implemented
KU0512 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,120 $1,800 Not Implemented
KU0512 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $1,520 $1,030 Not Implemented
KU0512 # 08 Y:1999 08 1999 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $990 $700 Not Implemented
KU0512 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $770 Not Implemented
KU0512 # 10 Y:1999 10 1999 CONVERT TO ELECTROSTATIC POWDER COATING $278,220 $513,480 Not Implemented
KU0512 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $800,000 $29,240 Not Implemented
KU0512 # 12 Y:1999 12 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,990 $233,750 Not Implemented
GT0655 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $5,800 $5,000 Implemented