Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0353 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $527 | $599 | Not Implemented |
IA0353 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $673 | $1,641 | Not Implemented |
IA0353 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $603 | $444 | Implemented |
IA0353 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21 | $11 | Implemented |
IA0353 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $950 | $557 | Implemented |
IA0353 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $487 | $40 | Implemented |
IA0353 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $155 | $312 | Not Implemented |
IA0353 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,450 | $439 | Implemented |
GT0788 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,396 | $3,768 | Implemented |
GT0788 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $144 | $1,100 | Implemented |
GT0788 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,890 | $0 | Implemented |
GT0788 # 05 Y:2004 | 05 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,123 | $3,450 | Implemented |
GT0788 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,315 | $31,400 | Not Implemented |
GT0788 # 03 Y:2004 | 03 | 2004 | COVER OPEN TANKS | $4,940 | $3,185 | Not Implemented |
GT0788 # 02 Y:2004 | 02 | 2004 | COMBINE UTILITY METERS | $16,373 | $0 | Not Implemented |
GT0788 # 01 Y:2004 | 01 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $7,899 | $0 | Implemented |
GT0788 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $760 | $1,200 | Implemented |
GT0788 # 10 Y:2004 | 10 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,462 | $1,000 | Not Implemented |
MI0084 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,732 | $1,000 | Not Implemented |
MI0084 # 02 Y:2004 | 02 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $600,000 | $183,400 | Not Implemented |
MI0084 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $28,289 | $17,650 | Not Implemented |
MI0084 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $697 | $590 | Not Implemented |
MI0084 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $198 | $0 | Not Implemented |
AM0469 # 06 Y:2004 | 06 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $340 | $0 | Implemented |
AM0469 # 05 Y:2004 | 05 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $890 | $0 | Not Implemented |