Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,214
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0233 # 08 Y:2003 | 08 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,622 | $1,535 | Not Implemented |
MS0233 # 09 Y:2003 | 09 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $579 | $968 | Implemented |
UU0047 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,212 | $710 | Implemented |
UU0047 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,536 | $4,800 | Not Implemented |
UU0047 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,044 | $9,000 | Implemented |
UU0047 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,693 | $0 | Not Implemented |
UU0047 # 05 Y:2003 | 05 | 2003 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $3,430 | $7,126 | Not Implemented |
UU0047 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $301 | $150 | Implemented |
UU0047 # 07 Y:2003 | 07 | 2003 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $4,941 | $765 | Not Implemented |
SD0326 # 01 Y:2003 | 01 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,623 | $0 | Not Implemented |
SD0326 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,397 | $4,000 | Implemented |
SD0326 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,861 | $20,000 | Not Implemented |
SD0326 # 04 Y:2003 | 04 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $14,893 | $7,700 | Not Implemented |
SD0326 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,795 | $384 | Not Implemented |
SD0326 # 06 Y:2003 | 06 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,905 | $7,000 | Not Implemented |
SD0326 # 07 Y:2003 | 07 | 2003 | USE PHOTOCELL CONTROLS | $4,846 | $6,000 | Not Implemented |
SD0326 # 08 Y:2003 | 08 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $2,034 | $500 | Not Implemented |
UM0222 # 01 Y:2002 | 01 | 2002 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $28,900 | $10,000 | Implemented |
UM0222 # 02 Y:2002 | 02 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $23,074 | $1,750 | Implemented |
UM0222 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,900 | $1,275 | Implemented |
UM0222 # 04 Y:2002 | 04 | 2002 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,523 | $2,000 | Not Implemented |
UM0222 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,261 | $4,000 | Not Implemented |
MI0028 # 01 Y:2002 | 01 | 2002 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $61,673 | $3,000 | n/a |
MI0028 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,305 | $930 | n/a |
MI0028 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,032 | $255 | n/a |