Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0134 # 03 Y:2013 | 03 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,044 | $2,500 | Implemented |
MZ0134 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $22,321 | $12,640 | Not Implemented |
MZ0134 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,250 | $61,965 | Implemented |
MZ0004 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,138 | $2,230 | Implemented |
MZ0004 # 02 Y:2007 | 02 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,457 | $3,412 | Not Implemented |
MZ0004 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,707 | $1,300 | Not Implemented |
MZ0004 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $184 | $150 | Implemented |
MZ0004 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,950 | $24,700 | Not Implemented |
MZ0004 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $6,900 | $2,950 | Not Implemented |
MZ0004 # 08 Y:2007 | 08 | 2007 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $56,125 | $0 | Not Implemented |
MZ0004 # 09 Y:2007 | 09 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,600 | $0 | Implemented |
MZ0004 # 06 Y:2007 | 06 | 2007 | DISCONNECT BALLASTS | $19,720 | $1,050 | Not Implemented |
MO0264 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $960 | $300 | Implemented |
MO0264 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,289 | $62 | Not Implemented |
MO0264 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,752 | $40 | Not Implemented |
MO0264 # 03 Y:1999 | 03 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $949 | $1,518 | Implemented |
MO0264 # 05 Y:1999 | 05 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,600 | $0 | Implemented |
MO0264 # 06 Y:1999 | 06 | 1999 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $8,000 | $2,000 | Not Implemented |
MO0264 # 07 Y:1999 | 07 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $4,000 | $700 | Not Implemented |
MO0100 # 10 Y:1993 | 10 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,060 | $790 | Implemented |
MO0100 # 01 Y:1993 | 01 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,010 | $9,429 | Implemented |
MO0100 # 02 Y:1993 | 02 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $740 | $130 | Implemented |
MO0100 # 03 Y:1993 | 03 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,336 | $1,158 | Implemented |
MO0100 # 04 Y:1993 | 04 | 1993 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,116 | $2,300 | Not Implemented |
MO0100 # 05 Y:1993 | 05 | 1993 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $486 | $50 | Implemented |