IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,214

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0773 # 01 Y:2019 01 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $17,060 $25,000 Not Implemented
AM0773 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,552 $12,220 Not Implemented
AM0773 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,768 $1,000 Implemented
AM0773 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13 $10 Implemented
AM0773 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,077 $480 Implemented
AM0773 # 06 Y:2019 06 2019 USE SYNTHETIC LUBRICANT $92 $40 Not Implemented
AM0773 # 07 Y:2019 07 2019 PAY UTILITY BILLS ON TIME $1,751 $0 Not Implemented
AM0773 # 08 Y:2019 08 2019 OPTIMIZE PLANT POWER FACTOR $6,464 $18,747 Not Implemented
MZ0262 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,670 $37,061 Implemented
MZ0262 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $3,589 $1,350 Implemented
MZ0262 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,138 $1,820 Not Implemented
MZ0262 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,400 $0 Not Implemented
MZ0262 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $850 $0 Not Implemented
MZ0262 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,156 $21,621 Not Implemented
MZ0262 # 07 Y:2019 07 2019 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $32,233 $65,000 Not Implemented
MZ0262 # 08 Y:2019 08 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,104 $8,000 Not Implemented
UK1806 # 13 Y:2018 13 2018 USE PLASTIC PALLETS INSTEAD OF WOOD $8,000 $18,890 n/a
UK1806 # 12 Y:2018 12 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,467 $0 n/a
UK1806 # 11 Y:2018 11 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $3,087 $775 n/a
UK1806 # 10 Y:2018 10 2018 OPTIMIZE PLANT POWER FACTOR $6,117 $6,090 n/a
UK1806 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,069 $4,175 n/a
UK1806 # 08 Y:2018 08 2018 USE PHOTOCELL CONTROLS $1,514 $2,900 n/a
UK1806 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,583 $99,639 n/a
UK1806 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $456 $0 n/a
UK1806 # 05 Y:2018 05 2018 USE RADIANT HEATER FOR SPOT HEATING $14,227 $14,700 n/a