Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,214
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0773 # 01 Y:2019 | 01 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $17,060 | $25,000 | Not Implemented |
AM0773 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,552 | $12,220 | Not Implemented |
AM0773 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,768 | $1,000 | Implemented |
AM0773 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13 | $10 | Implemented |
AM0773 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,077 | $480 | Implemented |
AM0773 # 06 Y:2019 | 06 | 2019 | USE SYNTHETIC LUBRICANT | $92 | $40 | Not Implemented |
AM0773 # 07 Y:2019 | 07 | 2019 | PAY UTILITY BILLS ON TIME | $1,751 | $0 | Not Implemented |
AM0773 # 08 Y:2019 | 08 | 2019 | OPTIMIZE PLANT POWER FACTOR | $6,464 | $18,747 | Not Implemented |
MZ0262 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,670 | $37,061 | Implemented |
MZ0262 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $3,589 | $1,350 | Implemented |
MZ0262 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,138 | $1,820 | Not Implemented |
MZ0262 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,400 | $0 | Not Implemented |
MZ0262 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $850 | $0 | Not Implemented |
MZ0262 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,156 | $21,621 | Not Implemented |
MZ0262 # 07 Y:2019 | 07 | 2019 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $32,233 | $65,000 | Not Implemented |
MZ0262 # 08 Y:2019 | 08 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,104 | $8,000 | Not Implemented |
UK1806 # 13 Y:2018 | 13 | 2018 | USE PLASTIC PALLETS INSTEAD OF WOOD | $8,000 | $18,890 | n/a |
UK1806 # 12 Y:2018 | 12 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,467 | $0 | n/a |
UK1806 # 11 Y:2018 | 11 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,087 | $775 | n/a |
UK1806 # 10 Y:2018 | 10 | 2018 | OPTIMIZE PLANT POWER FACTOR | $6,117 | $6,090 | n/a |
UK1806 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,069 | $4,175 | n/a |
UK1806 # 08 Y:2018 | 08 | 2018 | USE PHOTOCELL CONTROLS | $1,514 | $2,900 | n/a |
UK1806 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,583 | $99,639 | n/a |
UK1806 # 06 Y:2018 | 06 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $456 | $0 | n/a |
UK1806 # 05 Y:2018 | 05 | 2018 | USE RADIANT HEATER FOR SPOT HEATING | $14,227 | $14,700 | n/a |