Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,214
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0689 # 06 Y:2015 | 06 | 2015 | INSTALL SKYLIGHTS | $1,770 | $5,300 | Not Implemented |
AM0689 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $980 | $1,170 | Not Implemented |
AM0689 # 08 Y:2015 | 08 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $380 | $0 | Implemented |
WM0061 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $6,292 | $3,164 | Not Implemented |
WM0061 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $400 | $518 | Not Implemented |
WM0061 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,854 | $51,600 | Not Implemented |
WM0061 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,688 | $5,526 | Implemented |
WM0061 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,426 | $1,849 | Implemented |
WM0061 # 06 Y:2015 | 06 | 2015 | USE SYNTHETIC LUBRICANT | $2,017 | $1,155 | Implemented |
WM0061 # 07 Y:2015 | 07 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $721 | $2,000 | Not Implemented |
WM0061 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,308 | $23,529 | Not Implemented |
WM0061 # 09 Y:2015 | 09 | 2015 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $1,996 | $4,600 | Not Implemented |
WM0061 # 10 Y:2015 | 10 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $658 | $750 | Not Implemented |
WM0061 # 11 Y:2015 | 11 | 2015 | AUTOMATE FINISHING PROCESS | $294,525 | $175,000 | Not Implemented |
UM0452 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,871 | $1,000 | Not Implemented |
UM0452 # 02 Y:2015 | 02 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,393 | $2,500 | Implemented |
UM0452 # 03 Y:2015 | 03 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $28,779 | $28,000 | Implemented |
UM0452 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,903 | $4,000 | Implemented |
NC0514 # 01 Y:2014 | 01 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $23,503 | $100 | Implemented |
NC0514 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,824 | $50,000 | Not Implemented |
NC0514 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,388 | $5,250 | Not Implemented |
NC0514 # 04 Y:2014 | 04 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,509 | $10,000 | Not Implemented |
NC0514 # 05 Y:2014 | 05 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,436 | $50 | Implemented |
NC0514 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,983 | $100 | Implemented |
NC0514 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,002 | $7,540 | Implemented |