IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0335 # 08 Y:2018 08 2018 RECOVER WASTE HEAT FROM EQUIPMENT $1,157 $5,370 Implemented
MI0335 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,894 $2,030 Implemented
MI0335 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $8,063 Implemented
MI0335 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,545 $3,280 Implemented
MI0335 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,798 $7,385 Implemented
MI0335 # 05 Y:2018 05 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,932 $7,536 Implemented
MI0335 # 06 Y:2018 06 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,505 $480 Implemented
MI0335 # 07 Y:2018 07 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,235 $2,520 Implemented
MI0071 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $491 $2,100 Implemented
MI0071 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-1,062 $2,080 Implemented
MI0071 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $808 $2,527 Implemented
MI0071 # 04 Y:2004 04 2004 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,520 $2,160 Not Implemented
MI0071 # 05 Y:2004 05 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,800 $2,080 Implemented
MI0071 # 06 Y:2004 06 2004 REDUCE SCRAP PRODUCTION $76,111 $10,040 Not Implemented
MI0071 # 07 Y:2004 07 2004 EXPAND OPERATIONS INTO UNUSED SPACE $3,300 $30 Not Implemented
MI0071 # 08 Y:2004 08 2004 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $53,591 $28,480 Implemented
MI0028 # 02 Y:2002 02 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,305 $930 n/a
MI0028 # 06 Y:2002 06 2002 COVER OPEN TANKS $149 $48 n/a
MI0028 # 05 Y:2002 05 2002 RECYCLE WHITE WATER $5,465 $601 n/a
MI0028 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,051 $8 n/a
MI0028 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,032 $255 n/a
MI0028 # 01 Y:2002 01 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $61,673 $3,000 n/a
UF0203 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,508 $582 Not Implemented
UF0203 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,287 $1,200 Implemented
UF0203 # 03 Y:1998 03 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,304 $5,200 Not Implemented