IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

673

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0680 # 08 Y:2015 08 2015 USE SYNTHETIC LUBRICANT $355 $0 Implemented
AM0666 # 01 Y:2014 01 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,980 $15,030 Implemented
AM0666 # 02 Y:2014 02 2014 USE PHOTOCELL CONTROLS $4,405 $6,900 Implemented
AM0666 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,860 $4,450 Implemented
AM0666 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,308 $3,000 Implemented
AM0666 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $1,035 Implemented
AM0666 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $11 Implemented
AM0666 # 07 Y:2014 07 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $450 $430 Implemented
AM0666 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $420 $500 Implemented
SD0488 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,362 $2,700 Implemented
SD0488 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,681 $6,350 Implemented
CO0670 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,960 $670 Implemented
CO0670 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,800 $620 Implemented
CO0670 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,160 $330 Implemented
CO0670 # 05 Y:2013 05 2013 USE EVAPORATION TO CONCENTRATE MATERIAL $660 $0 Implemented
CO0670 # 06 Y:2013 06 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,080 $500 Implemented
BD0430 # 07 Y:2013 07 2013 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,500 $10,000 Implemented
WV0470 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,069 $2,050 Implemented
WV0470 # 07 Y:2013 07 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,736 $1,700 Implemented
WV0470 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $105 Implemented
WV0470 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,666 $1,080 Implemented
WV0470 # 02 Y:2013 02 2013 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $16,582 $68,000 Implemented
WV0470 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,095 $2,500 Implemented
OR0601 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,114 $0 Implemented
OR0601 # 06 Y:2013 06 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,546 $5,306 Implemented