Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,504

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0305 # 04 Y:2001 04 2001 USE SYNTHETIC LUBRICANT $592 $277 Not Implemented
AS0305 # 05 Y:2001 05 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,588 $110 Implemented
AS0305 # 06 Y:2001 06 2001 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $14,000 $1,360 Implemented
AS0305 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $63,963 $6,820 Implemented
AS0304 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $120 Not Implemented
AS0304 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $1,241 $1,992 Not Implemented
AS0304 # 03 Y:2001 03 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $764 $2,484 Not Implemented
AS0304 # 04 Y:2001 04 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,488 $648 Implemented
AS0304 # 05 Y:2001 05 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $64,704 $8,580 Implemented
AS0304 # 06 Y:2001 06 2001 AUTOMATE FINISHING PROCESS $58,240 $688 Not Implemented
AS0304 # 07 Y:2001 07 2001 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $29,680 $438 Not Implemented
AS0304 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $19,493 $294 Implemented
AS0304 # 09 Y:2001 09 2001 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $16,000 $3,940 Implemented
AS0301 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,381 $2,549 Not Implemented
AS0301 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,767 $5,107 Not Implemented
AS0301 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $388 $388 Not Implemented
AS0301 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,032 $110 Implemented
AS0301 # 05 Y:2001 05 2001 MODIFY STARTUP/SHUTDOWN TIMES $48,788 $383 Not Implemented
MI0009 # 01 Y:2001 01 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $14,580 $5,000 Not Implemented
MI0009 # 02 Y:2001 02 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,327 $12 Not Implemented
MI0009 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,745 $12 Not Implemented
MI0009 # 04 Y:2001 04 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $43,740 $2,550 Not Implemented
MI0009 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,083 $1,102 Not Implemented
MI0007 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,671 $281 Implemented
MI0007 # 02 Y:2001 02 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $138,240 $32,000 Implemented