IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0493 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,290 $23,430 Implemented
CO0493 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,500 $21,650 Not Implemented
CO0493 # 06 Y:2001 06 2001 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $7,270 $8,240 Not Implemented
CO0493 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,290 $360 Implemented
CO0493 # 04 Y:2001 04 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,960 $6,500 Implemented
CO0493 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,500 $6,270 Implemented
CO0487 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $11,370 $13,000 Not Implemented
CO0487 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,240 $18,000 Not Implemented
CO0487 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,950 $470 Implemented
CO0487 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,350 $60 Not Implemented
CO0487 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $0 Implemented
CO0487 # 06 Y:2001 06 2001 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $1,420 $1,150 Not Implemented
UF0280 # 08 Y:2001 08 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $117,000 $120,250 Not Implemented
UF0280 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $410 Implemented
UF0280 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,615 $7,198 Implemented
UF0280 # 03 Y:2001 03 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,000 $50 Implemented
UF0280 # 04 Y:2001 04 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,751 $25,263 Not Implemented
UF0280 # 05 Y:2001 05 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,972 $20,010 Not Implemented
UF0280 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,427 $8,000 Implemented
UF0280 # 07 Y:2001 07 2001 RECOVER AND REUSE WASTE MATERIAL $1,867 $534 Not Implemented
UF0280 # 09 Y:2001 09 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $14,321 $4,612 Implemented
AS0305 # 01 Y:2001 01 2001 INSTALL SKYLIGHTS $8,175 $16,112 Not Implemented
AS0305 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,492 $3,850 Not Implemented
AS0305 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $155 $225 Not Implemented
AS0305 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $63,963 $6,820 Implemented