matching recommendationsSIC | 3444 | Sheet Metalwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0493 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,290 | $23,430 | Implemented |
CO0493 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,500 | $21,650 | Not Implemented |
CO0493 # 06 Y:2001 | 06 | 2001 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $7,270 | $8,240 | Not Implemented |
CO0493 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,290 | $360 | Implemented |
CO0493 # 04 Y:2001 | 04 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,960 | $6,500 | Implemented |
CO0493 # 03 Y:2001 | 03 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,500 | $6,270 | Implemented |
CO0487 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,370 | $13,000 | Not Implemented |
CO0487 # 02 Y:2001 | 02 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,240 | $18,000 | Not Implemented |
CO0487 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,950 | $470 | Implemented |
CO0487 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,350 | $60 | Not Implemented |
CO0487 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $0 | Implemented |
CO0487 # 06 Y:2001 | 06 | 2001 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $1,420 | $1,150 | Not Implemented |
UF0280 # 08 Y:2001 | 08 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $117,000 | $120,250 | Not Implemented |
UF0280 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,550 | $410 | Implemented |
UF0280 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,615 | $7,198 | Implemented |
UF0280 # 03 Y:2001 | 03 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $15,000 | $50 | Implemented |
UF0280 # 04 Y:2001 | 04 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $11,751 | $25,263 | Not Implemented |
UF0280 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $9,972 | $20,010 | Not Implemented |
UF0280 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,427 | $8,000 | Implemented |
UF0280 # 07 Y:2001 | 07 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $1,867 | $534 | Not Implemented |
UF0280 # 09 Y:2001 | 09 | 2001 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $14,321 | $4,612 | Implemented |
AS0305 # 01 Y:2001 | 01 | 2001 | INSTALL SKYLIGHTS | $8,175 | $16,112 | Not Implemented |
AS0305 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,492 | $3,850 | Not Implemented |
AS0305 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $155 | $225 | Not Implemented |
AS0305 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $63,963 | $6,820 | Implemented |