Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3444 | Sheet Metalwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0670 # 06 Y:2013 | 06 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,080 | $500 | Implemented |
CO0670 # 05 Y:2013 | 05 | 2013 | USE EVAPORATION TO CONCENTRATE MATERIAL | $660 | $0 | Implemented |
CO0670 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $1,160 | $330 | Implemented |
CO0670 # 03 Y:2013 | 03 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,800 | $620 | Implemented |
CO0670 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,830 | $25,400 | Not Implemented |
CO0670 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,960 | $670 | Implemented |
BD0430 # 02 Y:2013 | 02 | 2013 | USE PHOTOCELL CONTROLS | $2,289 | $200 | Not Implemented |
BD0430 # 01 Y:2013 | 01 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $7,450 | $22,500 | Not Implemented |
BD0430 # 07 Y:2013 | 07 | 2013 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,500 | $10,000 | Implemented |
BD0430 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $600 | Not Implemented |
BD0430 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $397 | $200 | Not Implemented |
BD0430 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $741 | $25 | Not Implemented |
BD0430 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $3,520 | Not Implemented |
WV0470 # 10 Y:2013 | 10 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $152 | $380 | Not Implemented |
WV0470 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $105 | Implemented |
WV0470 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,892 | $3,300 | Not Implemented |
WV0470 # 07 Y:2013 | 07 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,736 | $1,700 | Implemented |
WV0470 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,069 | $2,050 | Implemented |
WV0470 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,422 | $13,020 | Not Implemented |
WV0470 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,666 | $1,080 | Implemented |
WV0470 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,807 | $20,200 | Not Implemented |
WV0470 # 02 Y:2013 | 02 | 2013 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $16,582 | $68,000 | Implemented |
WV0470 # 01 Y:2013 | 01 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $24,095 | $2,500 | Implemented |
OR0601 # 08 Y:2013 | 08 | 2013 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,164 | $8,104 | Implemented |
OR0601 # 07 Y:2013 | 07 | 2013 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $9,479 | $35,500 | Not Implemented |