IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
SIC 3446 Architectural Metal Work
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0700 # 06 Y:2016 06 2016 INSTALL SKYLIGHTS $1,030 $5,100 Not Implemented
AM0700 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $19 Implemented
AM0700 # 08 Y:2016 08 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $280 $62 Not Implemented
AM0700 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $615 $180 Implemented
AM0679 # 01 Y:2015 01 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,000 $4,040 Implemented
AM0679 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $5,340 $6,060 Implemented
AM0679 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,670 $200 Not Implemented
AM0679 # 04 Y:2015 04 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,350 $0 Implemented
AM0679 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,120 $0 Not Implemented
AM0679 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,100 $2,160 Not Implemented
AM0679 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $290 Not Implemented
AM0679 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $340 $0 Not Implemented
AM0679 # 09 Y:2015 09 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $100 $390 Not Implemented
LE0352 # 07 Y:2013 07 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,176 $1,000 Not Implemented
LE0352 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,414 $2,750 Implemented
LE0352 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,631 $1,000 Not Implemented
LE0352 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,554 $4,768 Not Implemented
LE0352 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,145 $9,935 Not Implemented
LE0352 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $5,554 $7,670 Not Implemented
LE0352 # 06 Y:2013 06 2013 CLEAN CONDENSER TUBES $2,216 $12,000 Not Implemented
LE0288 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,989 $2,500 Implemented
LE0288 # 08 Y:2009 08 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,311 $3,200 Not Implemented
LE0288 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,293 $8,000 Not Implemented
LE0288 # 01 Y:2009 01 2009 USE RADIANT HEATER FOR SPOT HEATING $25,233 $33,000 Not Implemented
LE0288 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,606 $1,000 Not Implemented