IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,038

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0275 # 13 Y:2003 13 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,716 $1,300 Not Implemented
WV0275 # 14 Y:2003 14 2003 INSTALL OCCUPANCY SENSORS $2,336 $1,200 Implemented
OK0662 # 01 Y:2003 01 2003 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $832 $3,222 Not Implemented
OK0662 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $181 $300 Not Implemented
OK0662 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,135 $3,289 Not Implemented
OK0662 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $406 $221 Not Implemented
OK0662 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $864 Not Implemented
OK0662 # 06 Y:2003 06 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,326 $23,100 n/a
OK0662 # 07 Y:2003 07 2003 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,701 $1,011 Not Implemented
OK0662 # 08 Y:2003 08 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,730 $1,000 Not Implemented
TA0049 # 01 Y:2003 01 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $573,800 $108,000 Not Implemented
TA0049 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,239 $0 Implemented
TA0049 # 03 Y:2003 03 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,900 $0 Implemented
TA0049 # 04 Y:2003 04 2003 DISCONNECT BALLASTS $1,775 $3,096 Implemented
TA0049 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,088 $162 Implemented
CO0508 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,450 $90 Implemented
CO0508 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,230 $7,000 Implemented
CO0508 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,570 $23,500 Not Implemented
CO0508 # 04 Y:2002 04 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $31,960 $1,620 Implemented
CO0508 # 05 Y:2002 05 2002 $115,000 $100,000 Not Implemented
IC0035 # 01 Y:2002 01 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $3,252 $1,500 Not Implemented
IC0035 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $12,947 $2,657 Implemented
IC0035 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $11,300 $7,092 Not Implemented
IC0035 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,174 $1,400 Not Implemented
OR0409 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,115 $33,646 Not Implemented