Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsSIC | 345 | Screw Machine Products, Bolts, Etc. |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0275 # 12 Y:2003 | 12 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,440 | $1,200 | Not Implemented |
WV0275 # 13 Y:2003 | 13 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,716 | $1,300 | Not Implemented |
UM0149 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $836 | $500 | Implemented |
UM0149 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $200 | Implemented |
UM0149 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,322 | $1,500 | Not Implemented |
UM0149 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,107 | $10,500 | Not Implemented |
UM0149 # 05 Y:1999 | 05 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,804 | $0 | Not Implemented |
UM0149 # 06 Y:1999 | 06 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,500 | $40,000 | Implemented |
UM0149 # 07 Y:1999 | 07 | 1999 | EXPAND OPERATIONS INTO UNUSED SPACE | $357,000 | $714,000 | Not Implemented |
UD0552 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,972 | $0 | Not Implemented |
UD0552 # 01 Y:1998 | 01 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $199,687 | $0 | Not Implemented |
UD0552 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,000 | $12,000 | Not Implemented |
UD0552 # 03 Y:1998 | 03 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $18,478 | $1,800 | Not Implemented |
UD0552 # 07 Y:1998 | 07 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,486 | $2,000 | Implemented |
UD0552 # 06 Y:1998 | 06 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,132 | $600 | Implemented |
UD0552 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,681 | $7,118 | Not Implemented |
UD0486 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,390 | $7,435 | Implemented |
UD0486 # 03 Y:1996 | 03 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $360 | $1,000 | Implemented |
UD0486 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,870 | $0 | Implemented |
UD0486 # 01 Y:1996 | 01 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $558 | $0 | Implemented |
UD0486 # 05 Y:1996 | 05 | 1996 | RECOVER AND REUSE COOLING WATER | $2,850 | $17,500 | Implemented |
UD0168 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $506 | $0 | Implemented |
UD0168 # 04 Y:1985 | 04 | 1985 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $536 | $0 | Not Implemented |
UD0168 # 03 Y:1985 | 03 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,217 | $896 | Not Implemented |
UD0168 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $688 | $300 | Not Implemented |